My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986 - 1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
440
>
2300 - Underground Storage Tank Program
>
PR0231055
>
COMPLIANCE INFO_1986 - 1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 3:43:50 PM
Creation date
11/27/2019 1:44:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 1997
RECORD_ID
PR0231055
PE
2361
FACILITY_ID
FA0002321
FACILITY_NAME
Delta arco
STREET_NUMBER
440
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRITTEN MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times. The information on this monitoring <br /> program are conditions of the operating permit. The permit holder must notify San Joaquin County <br /> Environmental Health Division, phone (209) 468-3420 within 30 days of any changes to the monitoring <br /> procedures, unless required to obtain approval before making the change. <br /> yRequired by Sections 2632(d) and 2641(h) CCR <br /> Facility Name le2,t- C-� <br /> Facility Address <br /> A. Describe the frequency of performing the <br /> r mnitorng: <br /> Tank L1 o-` <br /> ccnl-p < <br /> �- <br /> Piping <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the monitoring- <br /> fA <br /> Tank -1 L . ��� �, ��f c-; 't: 7, <br /> �f <br /> Piping e"I , p <br /> _ rt �_ _ r= L � - ,�-�, ' �•CF,1'F=c_ Svc'-. <br /> C. Describe the location(s) where the monitoring will be performed (facility plot plan <br /> should be attached): <br /> D. List the name(s) and title(s) of the people responsible for performing the monitoring <br /> and/or maintaining the equipment: <br /> _ Lc <br /> E. Reporting format for monitoring:. <br /> Tank <br /> Piping J <br /> F. Describe the preventive maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be in accordance with the manufacturers' maintenance schedule <br /> but not less that eve?L' months: 1 I f <br /> F' <br /> G. Describe the training necessary for the operation of UST system. inciucing piping, <br /> and the monitoring equipment: <br /> J ,� <br />
The URL can be used to link to this page
Your browser does not support the video tag.