My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1987
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
440
>
2300 - Underground Storage Tank Program
>
PR0231055
>
REMOVAL_1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 3:32:46 PM
Creation date
11/27/2019 3:00:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1987
RECORD_ID
PR0231055
PE
2361
FACILITY_ID
FA0002321
FACILITY_NAME
Delta arco
STREET_NUMBER
440
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■ ROBERT H. LEE &. ASSOCIATES, INC. <br /> ARCHITECTURE PLANNING ---ENGINEERINCP A Y M E N T <br /> 900 LARKSPUR LANDING CIRCLE.#125.LARKSPUR,CA 94838 - ( 5)499-899P E C E 1 V E D <br /> . NVIRONMENTA <br /> L HEALTH <br /> October 22 , 1987 / / � PERMITJSER' ICES <br /> Dan Moe R.S. <br /> Environmental Health Division <br /> 1601 East Hazelton Avenue 7-0P.O. Box 2009 <br /> Stockton, CA 95201 I � I [ / t /1,,, � � (77 <br /> TEXACO FOODMART <br /> 440 W. CHARTER WAY <br /> STOCKTON, CA <br /> JOB #2404 <br /> Dear Mr. Moe: <br /> As discussed yesterday, I am writing to you to confirm a number <br /> of procedures regarding our Application for the removal of <br /> underground petroleum piping at the above project site. I am <br /> also enclosing the balance of $60 required for the Permit. <br /> The contractor who is awarded the project will pick up the <br /> permit from your office and will provide you with the necessary <br /> information regarding his state license, worker's compensation <br /> insurance, etc. <br /> In regard to the piping work, I am confirming that the <br /> contractor will flush the pipes with water before removing thein <br /> to a Class III site. The waste mixture will be handled as a <br /> hazardous material and disposed of according to California State <br /> Regulations. In addition, the contractor will be responsible <br /> for contacting the Stockton Fire Department and notifying them <br /> 48 hours in advance of any work to be performed. As stated on <br /> the Site Plan (Drawing A-1) you received, the contractor will <br /> also contact Groundwater Technology to perform the soil <br /> contamination tests once the piping has been removed. <br /> C(DPY <br />
The URL can be used to link to this page
Your browser does not support the video tag.