Laserfiche WebLink
*- 0 { h a <br /> I 'Y <br /> David Chavier j f <br /> Page 2 <br /> 4. The stockpiled soil should be adequately characterized and documentation for disposal should be <br /> included in the Preliminary Investigation and Evaluation Report which will detail the results of <br /> the work proposed. PHS/EHD may be present to observe sampling','of the stockpile prior to its <br /> proposed removal, i <br /> j <br /> 5. Reports, and letters are to be submitted to both PHS/EHD and the Central Valley Regional <br /> Water Quality Control Board (CVRWQCB) until the investigation aid cleanup is adequate for <br /> closure. 'Ibis will facilitate concurrent and expeditious evaluation byl�both agencies. <br /> If you have any comments, questions, or to schedule a site inspection please contact Mary Meays, REHS, <br /> of my staff at (209) 468-3441. ;? <br /> jii k <br /> Jogi Khanna, M.D., M.P.H. <br /> Health Officer,* IP <br /> " 1 <br /> urie A. Cotulla, REHS, Program Manager <br /> Environmental Health Division !} <br /> ! <br /> 6 <br /> LAC/MM:lb , <br /> M Elizabeth Thayer, CVRWQCB <br /> C. Victor Cberven, Geological Audit Services ! '� <br /> r f <br /> Q James Hoblitzell, Falcon Energy <br /> 4 <br /> { <br /> i <br /> Ik <br /> q <br /> G <br />