My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
1320
>
3500 - Local Oversight Program
>
PR0545006
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 3:40:51 PM
Creation date
12/3/2019 3:00:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545006
PE
3528
FACILITY_ID
FA0009753
FACILITY_NAME
STOCKTON COLD STORAGE
STREET_NUMBER
1320
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
14519013
CURRENT_STATUS
02
SITE_LOCATION
1320 W WEBER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WHF Environmental Mnsultants, Inc. <br /> Health & Safety Plan <br /> Page: 2 <br /> 2. Assuring that personnel are aware of the provisions of this plan, are <br /> instructed in the work practices necessary to ensure safety, and in <br /> planned procedures for dealing with emergencies. <br /> 3. Assuring that personnel are aware of the potential hazards associated <br /> with site operations. <br /> 4. Monitoring the safety performance of all personnel to ensure that the <br /> required work practices are employed. <br /> 5. Correcting any work practices or conditions that may result in injury or <br /> exposure to hazardous substances. <br /> 6. Preparing any accident/incident reports (see attached Accident Report <br /> Form). <br /> 1.4 Project Employee <br /> Project Employees involved in on-site investigations are responsible for: <br /> 1. Taking all reasonable precautions to prevent injury to themselves and to <br /> their fellow employees. <br /> 2. Implementing Health and Safety Program and reporting to the PSO for <br /> any action deviating from the anticipated conditions described in the <br /> Health and Safety Plan. <br /> 1.5 Speciallnstrrictions <br /> It is the responsibility of the Project Manager and the Health and Safety <br /> Manager to review the available site information to determine, to what degree <br /> the Health and Safety Plan will be implemented. Each site will be handled on a <br /> case-by-cas:. basis. <br />
The URL can be used to link to this page
Your browser does not support the video tag.