My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012658
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
1320
>
3500 - Local Oversight Program
>
PR0545006
>
ARCHIVED REPORTS_XR0012658
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 4:32:19 PM
Creation date
12/3/2019 3:40:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012658
RECORD_ID
PR0545006
PE
3528
FACILITY_ID
FA0009753
FACILITY_NAME
STOCKTON COLD STORAGE
STREET_NUMBER
1320
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
14519013
CURRENT_STATUS
02
SITE_LOCATION
1320 W WEBER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y <br /> WIfI'T nvironmental ConSUlta."M Inc. <br /> Sampling Protocol <br /> page: 2 <br /> The cl.ttings from the drilling operation will be containerized on-site during <br /> drilling for proper disposition. The proper method of disposal will b: <br /> dependent upon results of laboratory analysis. this disposal will be the <br /> responsibility of the client unless other arrangements have been made. <br /> Well Corwrucliun <br /> All materials used in well constriction will be thoroughly cleaned prior to <br /> introduction into the boring. A bentonite or cement and bentonite grout will be <br /> placed at the bottom of the boring as necessary, After the seal has been allowed <br /> to set loll-enough to :support the weight of the casing, a 4- inch diameter Well <br /> casing (stainless steel or PVC) with end cap and factory perforations for <br /> placement in the saturated zone (taking into account seasonal variation) will be <br /> placed in the boring. The screen and filter pack sizes will be as noted in the <br /> well construction drawing. The casing and end caps will be threaded or joined <br /> by stainless steel screws, no PVC cement will be used. The filter pact:will <br /> extend two feet above the perforated zone. A bentonite seal 2- to 3-feet thick <br /> will be placed in the annular space above the filter pack followed 'uy a cement <br /> grout to the surface. Seal and filter pack elevations may change based on the <br /> underlying geology (Figure S). <br /> Well Development and Sampling <br /> The well will be developed until the .v:al water apl,ei.rs clear of sediment, or <br /> until an appropriate number of well volumes (based ii:r, the judgement of the <br /> responsible professional) have been evacuated. The water produced during well <br /> development will be containerized and left on-site in 55-gallon drums or other <br /> suitable containers for disposal as hazardous waste if deemed necessary upon <br /> receipt of laboratory results. Disposal will be the responsibility of the client <br /> unless other arrangements have been made. The wells will be allowed to <br /> stabilize for lwenly-four (24) hours prior to sampling. <br /> All soil and ground water samples wilt be properly labeled with date collected, <br /> project number, sample coordinator, and sample identification. Field records <br /> will document the above information and other significant data, such as names <br /> of on-site personnel, sampling methods, date and time of sampling, the number <br /> of-well_volutiles removed_before_sampling, preservatives added (if any), and any <br /> filtration performed on samples. <br />
The URL can be used to link to this page
Your browser does not support the video tag.