Laserfiche WebLink
UNION ICE C'oMP�41VY <br /> Weber Street, Stocklo,r, CA <br /> 1 <br /> to Final Soil Remedialion Report <br /> tlicCain Environmental Services <br /> 1.0 INTRODUCTION <br /> excavation of the former tank area. <br /> The contaminated soil involved <br /> wercame from e <br /> Approximately 1,0 yards <br /> 2.0 BACKGROUND <br /> The contaminated soil was stockpiled on asphalt and covered with six mil visqueen. <br /> 2.1. Sampling <br /> en and wre analyzed for TPH gas and BTXE. Please see <br /> Lab samples were tak <br /> attached results. <br /> 2.2 Permit <br /> An aeration permit was applied for and granted on March 12, 1991 (see <br /> attached). All restrictions on the permit were complied with during the course <br /> of the project. <br /> 3.0 TREATMENT <br /> Work was started on April 1, 1991, with the breakdown and spreading of contaminated <br /> 199 1. <br /> soil. This work continued for a period of five (5) days, until April S, <br /> 3.1 Scope of Treatment <br /> as <br /> Aeration was starred on April 2 and continued <br /> dailythrough <br /> onhAprilil5, 16,5. <br /> resumed on April 8 throughAprt r <br /> and 19. Work was resumed on April 25, 25, 29 and 30. <br />