My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
1325
>
3500 - Local Oversight Program
>
PR0545007
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 5:31:31 PM
Creation date
12/3/2019 4:43:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545007
PE
3528
FACILITY_ID
FA0025604
FACILITY_NAME
CATELLUS DEVELOPMENT PROPERTY
STREET_NUMBER
1325
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
1325 W WEBER AVE
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r { 2777 ButWhp Drive <br /> i SURS 200 <br /> r Walnut Creek, CA 945% <br /> 4* (3�MOW(Fox' <br /> ,F <br /> 8 December 1993 <br /> „'. Ms. Mary Meays <br /> Environmental Health Division <br /> San Joaquin County <br /> r ' ' 4451 N. San Joaquin Street ERM <br /> ti Stockto4 California 95201 <br /> SUBIECT: Confirmatory Soil Sampling <br /> Aerated Soil pile <br /> 1325 Weber Avenue Site <br /> Dear Mary <br /> Following our telephone conversation of today, ERM EnviroCleart West Inc, <br /> (EnviroCleark-West) is writing this leiter to confirm the details of the <br /> PTOP°sed confirmation sampling at the subject site. The sampling <br /> requirements will be as follows: <br /> Per San Joaquin County's requirement, Enviroaean-West will <br /> collect soil samples from the aerated pile from 20 discrete locations. <br /> The discrete samples will be romposited into 10 samples for laboratory <br /> analysis. All samples will be analyzed using EPA Method 8015/8020 <br /> (gasoline). <br /> Relatively undisturbed samples will be collected inside brass tubes <br /> hxam the aerated soil pile approximately 3 feet below pile surface using <br /> a hand-auger with a bucket and a slide hammer with a sample sleeve. <br /> All aamphng gear will be changed or deeDntaminated between,each <br /> sample location. Ail samples will be stored in a cooler, chilled with ice, <br /> immediately after collection. Chain-of-custody forms will be used for <br /> sample logging and tracking. <br /> The sampling will begirt at 10:00 AM on 9 December 2993 (thursday), <br /> and will be Inducted, in the presence of a San Joaquin County official. <br /> We estimate that the sampling process will be comploRd in about 4 <br /> hours. <br /> A h&MdW of Ow [ran AnW <br /> . �soprau�Mui�M�flDli� <br />
The URL can be used to link to this page
Your browser does not support the video tag.