Laserfiche WebLink
PUBLIC <br /> j,�El eLT 1lCIU1 lu SEI��1 ,G <br /> SAN JOAQUIN COUNTY <br /> �: . X <br /> JOG] KHANNA 1t.D.,NITH <br /> Healt")Officer <br /> P.O. Box 2009 • (1601 East Hazelton Avenue) • Stockton, Califomia 95201 <br /> C4LrFpR��P <br /> (209)468-3400 <br /> RIC NOTINI (C(Oply <br /> DIRECTOR OF ENVIRONMENTAL SERVICES <br /> CATELLUS DEVELOPMENT CORPORATION <br /> 201 MISSION STREET 30TH FLOOR FEB 2 01992 <br /> SAN FRANCISCO CA 94105 <br /> RE: Catellus Development Property SITE CODE: 1284 <br /> 1325 West Weber <br /> Stockton CA 95203 <br /> APN# 145-190-16 <br /> 1515 W Weber -- Former Tank #1 <br /> 1325 W Weber - Former Tank #2 <br /> 1541 W Weber - Former Tank #3 <br /> San Joaquin County Public Health Services Environmental Health <br /> Division (PHS/EHD) has completed review of the ERM-West submittal <br /> entitled "Soil and Groundwater Investigation Workplan" dated <br /> January 31, 1992 . Further information was provided by ERM-West <br /> representative, Bruce Pfaff during the February 10, 1992 <br /> telecommunication. PHS/EHD has the following comments. <br /> The site address and the site name has been changed to reflect <br /> the address of record for San Joaquin County Assessor' s Parcel <br /> Number (APN) 145-190-16. The site address has been changed from <br /> 1515 West Weber to 1325 West Weber. The site name has been <br /> changed from Farmer' s Feed to Catellus Development Property. <br /> Future references to contaminated areas on the property may be by <br /> facility address and former tank number. <br /> Another somewhat related topic is the labelling of the monitoring <br /> wells proposed to investigate the contamination associated with <br /> former tank #2 - 1325 West Weber. The Workplan labelled these <br /> wells as MW1, MW2 , MW3 , and MW4. Since the parcel already <br /> contains MW1 - MW5 another description to distinguish the <br /> proposed wells will be necessary. <br /> The Workplan proposed sampling the borings every 5 feet. PHS/EHD <br /> recommends the borings be sampled every 2 to 2 . 5 feet to better <br /> characterize the shallow vadose zone. <br /> The Workplan did not specify sample analysis of total petroleum <br /> hydrocarbon - diesel (TPH-d) . The presence of TPH-d has been <br /> confirmed, therefore, future sampling should undergo TPH-d <br /> analysis. <br /> A Division of San Joaquin Counry Health Care Services �� <br />