My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
1325
>
3500 - Local Oversight Program
>
PR0545007
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 5:31:31 PM
Creation date
12/3/2019 4:43:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545007
PE
3528
FACILITY_ID
FA0025604
FACILITY_NAME
CATELLUS DEVELOPMENT PROPERTY
STREET_NUMBER
1325
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
1325 W WEBER AVE
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ERKWestfii <br /> Suite 260• 1777 Botelho Drive_ Walnuf Creek; California 94596-5042 • (415).946-0455 •Telefax (415)946 9968. ." - <br /> _ June 12' 1991 <br /> J U N 1 7 19917 <br /> Ms . biane-Hinson ENVIRONK4E NAL HEALTH <br /> = Supervising REHS; - <br /> Public.Health Services/Environmental. Health - PERMIT/SERVICES: <br /> San Joaquin County- - <br /> = P: O. Box 2009 ; - <br /> .._ 1601 East Hazelton Avenue <br /> Stockton, CA.-.95201 <br /> SUBJECT: Problem.-Assessment Report and Quarterly Groundwater <br /> Monitoring-= 1515 Weber Ave., Stockton, CA-(Site-Code: 1280 <br /> - -Dear Diane: - - <br /> This letter reiterates our phone conversation ori Thursday;June 6,1991 and <br /> describes our proposed approach-for ad_ditional activities at 1515 Weber <br /> Avenue in.Stockton, CA: <br /> ERM-West, Inc. has implemented the Soil and Groundwater Investigation <br /> Workplan.submitted-to.you on March 20., 1991. Although we °are <br /> Pre pared to <br /> f submit these.data.for the single tank in question, two:additional recently <br /> discovered undergrouind=tanks have not yet'beern addressed. These two- <br /> tanks--have <br /> wo-tanks-have been-OcheduledTor_removal at the end'ofJune along-with <br /> appropriate veri-fication_samplipg: <br /> We understand,that a-Problem Assessment Report (PAR)'is to be submitted <br /> to the County'by June:17, 1991. We propose to postpone.submittal of this <br /> report until an assessment has been made of the two additional tanks. As: - <br /> you indicated during our conversation; this proposal is acceptable to you, _ <br /> pFovicled-ihdt'a reg sed'tiine irarne-be suurnitied. vJe d.sticipate brat; a" <br /> - comprehensive PAR_ will be complete by the end of August and will be <br /> submitted to you no later than September-15; 1991. - - - <br /> -- - - - The <br /> An affiliate of The-Environmental Resources Management Group with offices worldwide an"o <br />
The URL can be used to link to this page
Your browser does not support the video tag.