My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
1325
>
3500 - Local Oversight Program
>
PR0545007
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 5:31:31 PM
Creation date
12/3/2019 4:43:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545007
PE
3528
FACILITY_ID
FA0025604
FACILITY_NAME
CATELLUS DEVELOPMENT PROPERTY
STREET_NUMBER
1325
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
1325 W WEBER AVE
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> i <br /> Page 2 <br /> Ms. Mary Meays <br /> May 16, 1994 <br /> j For each extraction event, a fixed-volume of--ground water (approximately 4,000 <br /> gallons) will'be extracted from each'site using the existing monitoring wells. As <br /> described .and.documented in our ground-remediation activities report dated <br /> April 13, 1994, the extracted water will be pumped into Baker tanks for <br /> temporary storage and subsequently transported-via vacuum trucks to the City <br /> of Stockton Publicly-Owned Treatment Works (POTW) for discharge. . Prior to <br /> discharge, samples will-be collecfed from each tank and analyzed for volatile <br /> organic compounds and metals as required by the POTW. <br /> Based on the sample results from the four monitoring events, an evaluation of <br /> the ground water conditions at the,sites will be-made to determine whether <br /> additional .monitoring or extraction is necessary. <br /> We <br /> request that you respond in writing regarding-the proposed ground water <br /> . <br /> remediation activities. If we do not receive a written response within 30 days of <br /> thereceipt-of this letter, we will assume that-PHS/EHD concurs with the <br /> proposed approach._ <br /> rota <br /> Please contact Jill Quillin at 946-0455.if you have any comments or <br /> questions regarding the content of this letter. <br /> 3 <br /> Sincerely, <br /> ERM-WEST, INC. <br /> eloo <br /> Jill A. Quillin ; . Mark E. Ransom,'P.E. <br /> Project Manager Project Director <br /> MER/jaq./231$.00 <br /> cc. Kim Brandt, Catellus Development Corp. <br /> Elizabeth Thayer; CVRWQCB <br /> I <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.