My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012656
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
1325
>
3500 - Local Oversight Program
>
PR0545007
>
ARCHIVED REPORTS_XR0012656
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 5:31:51 PM
Creation date
12/3/2019 4:50:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012656
RECORD_ID
PR0545007
PE
3528
FACILITY_ID
FA0025604
FACILITY_NAME
CATELLUS DEVELOPMENT PROPERTY
STREET_NUMBER
1325
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
1325 W WEBER AVE
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
914
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SIM- N43ME" 11 _rON 4N r <br /> ' <br /> e <br /> .tiIr. Ric Notini ?ase 3 <br /> .Jay 28, i991 <br /> f. <br /> =� Standard ERM-West, Inc. Quality AssuranceiQuality Control (QA/QC) <br /> procedures were followed throughout the construction process. All augers <br /> were decontaminated prior to drilling each well by steam cleaning. The <br /> sampling device was decontaminated prior to each use by washing in an <br /> F Alconox solution followed by a clean water rinse. The brass tube liners for <br /> .. the sampler were similarly cleaned prior to drilling. The well casing, <br /> screen, etc. was cleaned and decontaminated prior to use by steam <br /> cleaning. Soil cuttings from each boring were placed in Ial eled 55-gailon <br /> drums and stored on site. <br /> Well DgyCi?pment and Water Sa_mnl;n <br /> Following construction, the new wells were developed and the pre-existing <br /> ,.� wells were purged prior to sampling. Development was accomplished by <br /> hand bailing approximately 18 gallons or 12 to 13 well volumes from each <br /> ' $ well. The bailing was continued until the parameters of temperature. pH, <br /> and conductivity stabilized, and the silt content of the discharge water <br /> 1A markedly declined. The pre-existing wells were purged by bailing a similar <br /> volume of water. <br /> i QA/QC procedures were followed during development and purging. Prior <br /> to work at each well, the bailer was cleaned and decontaminated with an <br /> Alconox solution followed by a clean water rinse. Bailer cord was replaced <br /> �. between each location. Bailed water and water from decontamination <br /> ...,,, procedures was contained in 55-gallon drums and stored on site. <br /> + r After development and purging procedures were completed, all wells were <br /> sampled. The wells were sampled with a pre-cleaned Teflon bailer <br /> equipped with a removable petcock. Nater was transferred from the bailer <br /> into laboratory supplied bottles. All samples (water and soil) provided to the <br /> laboratory were labeled and sealed individually in zip-lock type plastic bags <br /> then placed on ice in a coolei. <br /> SoiLand Water -Amalyses <br /> The soil and water samples were submitted to Curtis &Tompkins, Ltd., a <br /> California Department of Health Services (DHS)certified laboratory located <br /> in Berkeley, California. The samples were shipped Y p Peed under chain-of-custody <br /> and analyzed according to the following test procedures. <br /> • Total Petroleum Hydrocarbons as Gasoline, EPA Method 8015-1lodified- <br /> 0 Benzene, Toluene, Ethylbenzenes and Xylene (BTE&X), EPA Method <br /> 8020. <br /> • Organic lead, DHS Method. <br />
The URL can be used to link to this page
Your browser does not support the video tag.