My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012656
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
1325
>
3500 - Local Oversight Program
>
PR0545007
>
ARCHIVED REPORTS_XR0012656
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 5:31:51 PM
Creation date
12/3/2019 4:50:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012656
RECORD_ID
PR0545007
PE
3528
FACILITY_ID
FA0025604
FACILITY_NAME
CATELLUS DEVELOPMENT PROPERTY
STREET_NUMBER
1325
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
1325 W WEBER AVE
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
914
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ - - __vim � - - •s1- - <br /> visible. An example of a sample label and custody seal are attached at the end of this <br /> appendix. <br /> _. A Kleinfelder chain-of-custody form is attached to the cooler. The chain-of-custody form <br /> includes Kleinfeider's name, address and telephone number. the employee number of the <br /> individual who performed the sampling, the sample numbers, the date and time the <br /> samples were collected, the number of containers each sample occupies, and the analyses <br /> for which the samples are being submitted. The chain-of-custody form is signed by each <br /> Person who handles the satrapies, including all Kleinfelder employees and the receiving <br /> employee of the analytical laboratory when the samples are delivered. An example of the <br /> chain-of-custody form is attached. <br /> 13-3.4 Equipment Decontamination <br /> To reduce the potential for cross-contamination between wells, all developing and <br /> sampling equipment is washed in a trisodium phosphat,. sk lutiun and rinsed in distilled <br /> water or steam cleaned prior to use in the next monitoring well. <br /> B-3S Well Survey <br /> i <br /> 'Me locations of soil borings and monitoring weits and the elevation of the top of the PVC <br /> casings is usually surveyed and tied ;nto permanent markers, if readily available. Survey <br /> accuracy is 0.1 foot for the "x' and "y" coordinates and.01 foot for the "z" coordinate. The <br /> depth to static ground water is measured from a set location at t1e top of the FVC casing. <br /> The depth of water is then subtracted from the elevation of the top of the well casing to <br /> provide a ground water elevation for each monitoring well location. <br /> F6-FIELDPRO <br />
The URL can be used to link to this page
Your browser does not support the video tag.