My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012656
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
1325
>
3500 - Local Oversight Program
>
PR0545007
>
ARCHIVED REPORTS_XR0012656
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 5:31:51 PM
Creation date
12/3/2019 4:50:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012656
RECORD_ID
PR0545007
PE
3528
FACILITY_ID
FA0025604
FACILITY_NAME
CATELLUS DEVELOPMENT PROPERTY
STREET_NUMBER
1325
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
1325 W WEBER AVE
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
914
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 2 <br /> SOIL AND GROUNDWATER <br /> IIVVEsTIGATION WORKPLAN <br /> Thioposed work for further evaluation of sail <br /> andsgroundw tesection lr condines itions ns of the former underground storage tank <br /> site. <br /> Scope of Work <br /> The groundwater flow direction under the tank site was determined <br /> through water level measurements in three monitoring wells. <br /> Unfortunately, none of the wells were situated immediately <br /> downgradient of the former location of the tants. ERM-West proposes <br /> to remedy the lath of downgradient information through the <br /> construction of two additional monitoring wells. One well will be <br /> located within the perimeter of the former tank location and the <br /> second well will be located within approximately 10 feet of the tank <br /> location and hydraulically downgradient of the tank site(Figure 1-2). <br /> Monitoring Well Construction <br /> The monitoring wells will be drilled utilizing a truck-mounted drill <br /> rig equipped with hollow-stem auger. Prior to the start of each well, <br /> the augers will be cleaned and decontaminated by the use of steam. <br /> Soil samples will be collected at five-foot intervals during drilling <br /> using a split-spoon s�-npler equipped with pre-cleaned brass liners. <br /> The sampler will be cleaned prior to each use in an A.lcone so beton <br /> and clean water rinse. The maximum depth of each boring <br /> willfeet. Samples will be visually classified in the field according to the <br /> Unified Soil Classification System. an organic vapor meter -,vili be <br /> used to screen a portion of the sampled material through head space <br /> measurements. Sample descriptions, head space measurements, <br /> observations, etc., will be recorded along with the depth interval of <br /> the sample on a logging form. <br /> .. ...--. ...-- .-.- ......... -... .---- . - ...- Soil.samples-retained..in brass tubes will be secured by covering the <br /> _ ends of the tubes with Teflon film and plastic caps.-- Samples Will <br /> then be labeled. The label will contain a unique sample number, the <br /> __ 2-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.