Laserfiche WebLink
x <br /> After the wells are constructed and developomnwn landmalrxs <br /> surveyed for elevation and located by taping <br /> The elevation of the Se obfvt he peeve u ons�ci tont.compares to the <br /> same elevation base u <br /> re-cleaned Teflon bailer. Nater <br /> The wells will be sampled using a P ro rided by the laboratory. After <br /> samples will be placed in containers p <br /> a sample is collected, it will be labeled. The label will cdateland <br /> unique sample number, the project name and elobc0 toeson' will then be <br /> time, and the samplers initials. The ensealed and placed on ice in <br /> placed in Zip-Lock type plastic bags, r shipped or delivered to the <br /> a cooler. ander males will <br /> stody ithe <br /> laboratory <br /> the pre-emsting monitoring wells will be <br /> During the sampling event, rocedures will be <br /> purged , then sampled. The same sampling p <br /> followed. <br /> maple Analysis <br /> A total of eight soil samples, and six water samples will be analyzed <br /> for: <br /> • Total Petroleum Hydrocarbons as Gasoline- EPA Method 80151 <br /> • <br /> EPA Method 8620 <br /> Benzene,Toluene, Ethylaanzenes,and Xylenes - <br /> • Organic lead <br /> 2-3 <br />