Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form . The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment,' 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> UST Monitoring Site Plan <br /> She Address: Fast N Esy #16 1399 E Yosemite Ave Manteca CA 95336 <br /> STORE *PIPING } <br /> (ARROR"S) <br /> . - - - - Drar ine of piping <br /> exit of sump and <br /> � . . underground <br /> draining is 4W4g4Wv <br /> %me [drat <br /> . . . . speculate blue <br /> prints, <br /> E-STOP i) --- -� <br /> N <br /> r <br /> t <br /> h <br /> ter <br /> 0 <br /> S7 . _ .DIE Ct <br /> d <br /> L L Lx . . x s <br /> • _ 4 _ _ _ .2 <br /> X <br /> . w7JDIE. _ <br /> X X - - - <br /> � e <br /> P _ . <br /> . _ _ , _ - , . I - 8 . , I I I - , 8 . wYDiesel Snap Taps . <br /> F F - <br /> KEY <br /> Any items underground that are not disable to the cexdf3-ing tedmician are a A = AMNIULAR <br /> professional opinion only and are eolely for infonuationa]. purposes. Dran-ing not to F = FILLS <br /> scale. T = TLT%BLNE <br /> P = PROBE <br /> ■ YOSEMITE AVE V = VAPOR <br /> X = SUNIP SIE iSOR <br /> L = Leak Detector <br /> ISI = xhuiray <br /> B = Brine Sensor <br /> I = Stuart Sensor <br /> S = STP <br /> C = Floato & Chains <br /> Date map was drawn: 614H9 E = E Scop <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it rather than this page, with your Monitoring System Certification. On your site plan , <br /> shave the general layout of tanks and piping_ Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br /> annular spaces, sumps , dispenser pans, spill containers• or other secondary containment areas; mechanical or electronic line leak detectors; and in-tank liquid level <br /> probes (if used for leak detection). In the spare provided, note the date_ this Site Plan was prepared. <br /> LEGEND <br />