Ms Mary Meays Page 6 <br /> March 2, 1994 <br /> feet in width (inclusive of side slope dimensions) In the proximity of the <br /> building wall, the excavation was sloped at a minimum 1 1 slope to avoid <br /> undermining the building structure For excavation below a depth of seven <br /> feet, a substantial seepage of ground water was encountered Further soil <br /> excavation and confirmation sarn lin below thi5 depth required dewatering <br /> of the excavation tots o approximately 4,500 gallons of ground water was <br /> umped from the excavation at Site 2 usin a vacuum-truck oil excavation <br /> activities procee a urn eit er the cleanup goals were attained at the <br /> excavation sidewalls and bottom or until prevailing site conditions_prevented <br /> further excavation The limiting conditions on the excavation were either <br /> t e grown wa er seepage creating a spongy, unstable bottom or the proximity <br /> of the building wall preventing additional excavation Eighteen soil samples <br /> to confirm the cleanup goals were collected from the excavation bottom as <br /> well as the sidewalls <br /> Prior to backfilling Site 2 with clean dirt, the saturated bottom of the <br /> excavation was stabilized by laying out a geotextile fabric (Amoco 4545) <br /> covered with a four-foot-thick rock base consisting of one- to two-inch- <br /> diameter size rock The remainder of the excavation was backfilled using <br /> clean dirt compacted in 6- to 8-inch lifts using conventional construction <br /> equipment The soil was compacted to 90 percent to prevent excessive <br /> settling The compaction was verified with a nuclear density gauge The <br /> backfill operations were completed on 8 October 1993, and the site was <br /> subsequently paved with a 4-inch asphalt cover to match the existing grade <br /> EXCAVATION CONFIRMATION SAMPLING <br /> Confirmation soil sampling was conducted between 7 October 1993 and 19 <br /> October 1993 at Site 1 and between 6 October 1993 and 14 October 1993 at Sito <br /> amp es were ana yze so ine range H by EPA Method 8015- <br /> Modified and BTEX by EPA Method 8020 <br /> The confirmation sample locations at Sites 1 and 2 are illustrated in Figures 3 <br /> and 4, respectively Samples were collected from the sidewalls as well as the <br /> bottom of the excavations The majority of the soil samples were collected <br /> with a pre-cleaned brass tube placed directly into the soil in the backhoe <br /> bucket However, some sidewall samples were collected by driving a pre- <br /> cleaned brass tube approximately six inches into the soil The samples were <br /> sealed, labeled, and transported to the TEG mobile laboratory under chain-of- <br /> custody procedures The results of the confirmation sample analyses are <br /> shown in Tables 1 and 2 The laboratory data sheets are provided in <br /> Appendix A <br /> All soils containing concentrations in excess of cleanup goals (100 ppm TPHg <br /> and 1 ppm BTEX total) were excavated from both sites except for the soils <br /> directly adjacent to the building foundation or underneath the building <br />