Laserfiche WebLink
1 <br />' TABLE OF CONTENTS <br /> Paye <br /> LIST OF TABLES vii <br /> LIST OF FIGURES viii <br />' SECTION I <br /> INTRODUCTION 1-1 <br /> SECTION 2 <br /> BACKGROUND INFORMATION 2-1 <br /> Site History and Setting 2"1 <br /> Geography 2-1 <br /> Geologic Setting 2"2 <br /> Ground Water Hydrology 2-2 <br /> SECTION 3 <br /> TANK REMOVAL AND INVESTIGATION: <br /> FORMER TANK SITE #3 3-1 <br /> Preparation 3-1 <br /> Tank Survey 3-1 <br /> Closure Plan 3-1 <br /> Health and Safety Plan 3.2 <br /> Utilities 3-2 <br /> Permits 3-2 <br /> Tank Removal 3-2 <br />' Tank Emptying 3-3 <br /> Tank Inerting 3-3 <br />' Excavation and Removal 3-3 <br /> Confirmation Sampling 3-3 <br /> Laboratory Analyses 3-4 <br /> Backfilling and Paving 3-4 <br />' Summary of Findings 3-4 <br /> i <br />