My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007892
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
1325
>
3500 - Local Oversight Program
>
PR0545007
>
ARCHIVED REPORTS_XR0007892
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2019 2:37:23 PM
Creation date
12/5/2019 1:48:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007892
RECORD_ID
PR0545007
PE
3528
FACILITY_ID
FA0025604
FACILITY_NAME
CATELLUS DEVELOPMENT PROPERTY
STREET_NUMBER
1325
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
1325 W WEBER AVE
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 1 <br /> INTRODUCTION <br /> This document is a work plan for a soil and ground water <br /> investigation of the former underground storage tank (UST) site <br /> located in Stockton, California (San Joaquin County) (Figure 1-1). <br /> The tank was situated adjacent to an active warehousing facility at <br /> 1325 West Weber Avenue (Figure 1-2). The facility is currently <br /> occupied by Graphic Contractors <br /> A copy of the investigation work pian request letter for this site is <br /> included in my P <br /> County <br /> dix A. The request letter was written by San <br /> Joaquin Ca yubh c Health Services, Environmental Health <br /> Division <br /> Tank History <br /> The proposed investigation area formerly contained one <br /> underground fuel storage tank which was situated immediately <br /> adjacent to a warehouse. ERM-West, acting on the behalf of Catellus <br /> Development Corporation managed the tank removal activities in <br /> August 1991 under a permit issued by the San Joaquin Department of <br /> Public Health Services. Jim Dobbas Inc , located in Newcastle, <br /> California, provided the construction services. Ramos <br /> Environmental Services in West Sacramento, California, provided <br /> services to empty, transport, and dispose the contents of the tank at <br /> their facility <br /> The top of the former tank was approxiimaete 1 The fuelow the <br /> had a <br /> ground surface and the bottom was at e <br /> capacity of approximately 500 gallons A total of 403 gallons of liquid <br /> (water with some gasoline) was removed from the tank during tank <br /> removal activities. The tank was severely corroded and contained <br /> several holes It was of single wail steel construction and was <br /> primarily used to store gasoline. There is no information available to <br /> indicate the total quantity of product that escaped from the tank. <br /> om the tank excavation <br /> Samplesindicated theil cwater obtained r esene of total petroleum hydrocarbons as gasoline <br /> iridic P <br /> and diesel, and total xylenes (Table 1-1) <br /> 1-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.