Laserfiche WebLink
1 <br /> SECTION 5 <br /> 1 <br /> DETAILED IMPLEMENTATION FLAN <br />' As described in Section 4, the selected alternative includes excavation and <br /> off-site disposal of the affected soil <br /> 1 <br /> Preparation <br /> Preparation for the remediation will include subcontractor selection, <br /> preparation of a health and safety plan, selection of Class II landfill, <br /> 1 backfill certification, and obtaining the required permits <br /> Permit Re uirements <br /> A grading permit from the City of Stockton will be required to proceed <br /> with the remediation The grading permit is a simple one-page form that <br /> can be obtained on a walk-in basis from the City of Stockton Permit Office <br /> Health and Safety Plan <br /> The health and safety plan prepared for this work will address the <br /> following areas <br />' • Excavation safety, <br /> • Chemical hazards during excavation, and <br /> • Heavy equipment safety <br />' The health and safety plan will also provide information on personal <br /> protective equipment, personnel monitoring, decontamination, and <br /> emergency procedures <br /> I <br /> i <br /> 5-1 <br />