My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007928
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
1325
>
3500 - Local Oversight Program
>
PR0545007
>
ARCHIVED REPORTS_XR0007928
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2019 2:39:37 PM
Creation date
12/5/2019 2:20:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007928
RECORD_ID
PR0545007
PE
3528
FACILITY_ID
FA0025604
FACILITY_NAME
CATELLUS DEVELOPMENT PROPERTY
STREET_NUMBER
1325
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
1325 W WEBER AVE
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Excavation Confirmation Sampling <br /> A California-certified laboratory will analyze soil samples to confirm that <br /> TPH-impacted soils have been adequately excavated These confirmation <br /> samples will be analyzed for TPH (gasoline and/or diesel, as appropriate) <br /> by United States Environmental Protection Agency (USEPA) Method <br /> 8015-Modified, and for BTEX by USEPA Method 8020 Because the <br /> monitoring data have not shown EDB or lead above levels of concern, <br /> analysis for these compounds will not be performed <br /> The confirmation sampling program will consist of collecting a total of <br /> --�� five four-point composite samples from 1) the base of the excavation and <br /> 2) each excavation wall Samples will be collected either by directly <br /> driving a pre-cleaned brass tube six inches deep into the soil, or by <br />' collecting a sample from the backhoe bucket For samples collected from <br /> the backhoe bucket, the backhoe will collect a full bucket from the <br />' appropriate sampling location A pre-cleaned brass tube will then be <br /> pushed into the mass of soil in the backhoe bucket until the tube is filled <br /> Tubes will be sealed by placing TeflonO film over the ends and securing it <br />' 1n place with plastic caps Each tube will be labeled with a unique sample <br /> number The tubes will then be placed in a ZxplocO-type plastic bag, <br /> sealed, and placed on ice in a cooler until they are analyzed <br /> Excavation Backfillin <br /> The excavations will be backfilled as soon as possible after the <br /> confirmation sampling and analysis have been completed As noted <br /> earlier, any soils that are excavated and found by testing to contain <br /> TPH/BTEX concentrations below the action levels will be stockpiled for <br /> reuse as backfill The remaining area of the excavations will be backfilled <br />' with clean, certified backfill Where necessary, geo-textile/rock <br /> stabilization will be utilized <br />' The excavations will be backfilled 1n 6- to 8-inch lifts, and compacted with <br /> a small steam roller 1 The soil will be compacted to 90 percent to prevent <br /> excessive settling The soil compaction will be verified with a nuclear <br /> density gauge during the backfilling operations <br /> 1 <br /> 1 <br /> Because of the small area of the proposed excavations,conventional equipment would be too <br />' large <br /> 5-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.