Laserfiche WebLink
TABLE 1 <br /> Summary of Ground Water Monitoring Data <br /> Former Tank Site #1 <br /> Total lead <br /> Date TPH(g) TPH(d) MtBE Benzene Toluene Ethylbenzene Xylenes EDB (Organic) Lead(Total) <br /> Well Identifier Sampled (mg/1) (mg/1) (mg/1) (mg/1) (mg/1) (mg/1) (mg/1) (mg/1) (mg/1) (mg/1) <br /> MW-2 1/27/94 <0 050 NA NA <0 0005 <0 0005 <0 0005 <0 0005 NA NA NA <br /> (continued) 5/26/94 <0 050 NA NA <0 0005 <0 0005 <0 0005 <0 0005 NA NA NA <br /> 8/29/94 <0 050 NA NA <0 0005 <0 0005 <0 0005 <0 0005 NA NA NA <br /> 11/17/94 <0 050 NA NA <0 0005 <0 0005 <0 0005 <0 0005 NA NA NA <br /> 11/2/95 NA NA NA NA NA NA NA NA NA NA <br /> 2/2/95 <0 050 NA NA <0 0005 <0 0005 <0 0005 <0 0005 NA NA NA <br /> 3/7/96 <0 050 NA <0 005 <0 0005 <0 0Q05 <0 0005 <0 0005 NA NA NA <br /> ORC Baseline 10/11/96 <0 050 0 048J NA —<0005 <0 005 <0 005 <0 005 NA NA NA <br /> Post-ORC 12/18/96 <0 050 <0 050 NA <0 002 <0 002 <0 002 <0 002 NA NA NA <br /> Installation 5/6/97 <0 050 0 066 NA <0 002 <0 002 <0 002 <0 002 NA NA NA <br /> 9/19/97 <0 050 <0 050 NA <0 001 <0 001 <0 001 <0 001 NA NA NA <br /> MW-3 4/16/91 <0 05 NA NA <0 0005 <0 0005 <0 0005 <0 0005 NA <0 01 NA <br /> Pre-ORC 9/9/91 <0 03 NA NA <0 0003 <0 0003 <0 0003 <0 0003 <1 <05 NA <br /> Istallation 12/23/91 <0 05 NA NA <0 0005 <0 0005 <0 0005 <0 0005 <0 00002 <01 <0 0030 <br /> 3/12/92 <0 05 NA NA <0 0003 <0 0003 <0 0003 <0 0003 <0 00001 <01 <01 <br /> 6/3/92 <0 030 NA NA <0 00030 <0 0003 <0 0003 <0 0003 <0 0005 <0 050 0 013 <br /> 9/1/92 <0 050 NA NA <0 0005 <0 0005 <0 0005 <0 0005 NA NA NA <br /> 12/8/92 <0 050 NA NA <0 0005 <0 0005 <0 0005 <0 0005 NA NA NA <br /> 3/5/93 <0 050 NA NA <0 0005 <0 0005 <0 0005 <0 0005 NA NA NA <br /> 4/30/93 <0 050 NA NA <0 0005 <0 0005 <0 0005 <0 0005 NA NA NA <br /> 1/27/94 <0 050 NA NA <0 0005 <0 0005 <0 0005 <0 0005 NA NA NA <br /> 5/26/94 <0 050 NA NA <0 0005 <0 0005 <0 0005 <0 0005 NA NA NA <br /> 8/29/94 <0 050 NA NA <0 0005 <0 0005 <0 0005 <0 0005 NA NA NA <br /> 11/17/94 <0 050 NA NA <0 0005 <0 0005 <0 0005 <0 0005 NA NA NA <br /> 11/2/95 NA NA NA NA NA NA NA NA NA NA <br /> 2/2/95 <0 050 NA NA <0 0005 <0 0005 <0 0005 <0 0005 NA NA NA <br /> _ 3/7/96 <0 050 0180 <0 005 <0 0005 <0 0005 <0 0005 <0 0005 NA NA NA <br /> _ <br /> OV Baseline 10/11/96 <0 050 0 046J NA <0 005 <0 005 <0 005_ <0 0_05 NA NA NA <br /> Post-ORC —12/18/96—<–O 050 —<0050—NA--- -<0 002 <0 002 <0 002 <0 002 NA _ NA NA <br /> Installation 5/6/97 <0 050 0105 NA <0 002 <0 002 <0 002 <0 002 NA NA NA <br /> 9/19/97 <0 050 <0 050 NA <0 001 <0 001 <0 001 <0 001 NA NA NA <br /> Page 2 of 4 <br />