My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
1320
>
2900 - Site Mitigation Program
>
PR0012831
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2019 4:38:15 PM
Creation date
12/5/2019 4:20:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0012831
PE
2960
FACILITY_ID
FA0004036
FACILITY_NAME
UNION ICE/DONS DISTRIBUTION
STREET_NUMBER
1320
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
14519013
CURRENT_STATUS
02
SITE_LOCATION
1320 W WEBER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Install optional monitoring wells in the two optional borings. <br /> • Well construction to be accomplished in accordance with all applicable State of California regulations and <br /> USACE guidance and standards. <br /> • Proper well development of all wells installed. <br /> • Properly dispose of solid and liquid investigation-derived waste pending waste classification(to be <br /> analyzed under separate contract). <br /> • Boring decommissioning(optional,only required if a boring is not to be completed as a well). <br /> 1.4 Scope: <br /> This PWS is for drilling,sampling,and well installation services with the goal of installation of four deep <br /> groundwater monitoring wells. Drilling and installation of two wells are base items to the contract,while drilling <br /> and installation of an additional two wells are options. Services include subsurface drilling using a rotosonic drilling <br /> rig to approximately 300 feet depth,groundwater grab sampling through temporary drill casing,well installation, <br /> well development,and optional boring decommissioning pending groundwater grab sampling results should real- <br /> time decisions result in elimination of one or more optional wells. The Contractor shall provide documentation <br /> supporting well installation work including but not limited to State of California well installation permits and well <br /> completion reports. <br /> 1.5 Period of Performance: <br /> The period of performance shall be for 135 calendar days. <br /> 1.6 General Information: <br /> 1.6.1 Quality Control: <br /> The Contractor's internal quality control process shall be sufficient to successfully accomplish all work described <br /> herein. <br /> 1.6.2 Quality Assurance: <br /> The Government shall evaluate the Contractor's performance under this contract in accordance with the Quality <br /> Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the <br /> Contractor has performed in accordance with the performance standards. It defines how the performance standards <br /> will be applied,the frequency of surveillance,and the minimum acceptable defect rate(s). <br /> 1.6.3 Recognized Holidays: <br /> The Contractor is not required to perform services on the following recognized holidays: <br /> New Year's Day Labor Day <br /> Martin Luther King Jr.'s Birthday Columbus Day <br /> President's Day Veteran's Day <br /> Memorial Day Thanksgiving Day <br /> Independence Day Christmas Day <br /> 1.6.4 Hours of Operation: <br /> The Contractor is responsible for conducting business,between the hours of 0700-1730(7 A.M to 5:30 P.M) <br /> Monday thru Friday except Federal holidays. The Contractor must at all times maintain an adequate workforce for <br /> the uninterrupted performance of all tasks defined within this PWS. When hiring personnel,the Contractor shall <br /> keep in mind that the stability and continuity of the workforce are essential. <br /> 1.6.5 Place of Performance: <br /> The work to be performed under this contract will be performed at West Weber Avenue and/or points immediately <br /> north or south of West Weber should alternate drill locations be exercised,in all cases just north of the McCormick <br /> and Baxter Superfund Site(site address is 1214 West Washington Street),Stockton,California. <br /> 1.6.6 Type of Contract: <br />
The URL can be used to link to this page
Your browser does not support the video tag.