My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
1320
>
2900 - Site Mitigation Program
>
PR0012831
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2019 4:38:15 PM
Creation date
12/5/2019 4:20:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0012831
PE
2960
FACILITY_ID
FA0004036
FACILITY_NAME
UNION ICE/DONS DISTRIBUTION
STREET_NUMBER
1320
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
14519013
CURRENT_STATUS
02
SITE_LOCATION
1320 W WEBER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WHF Environmentac Consultants, Inc. <br /> Health & Safely Plan <br /> Page: 4 <br /> 3.2 Emergency Procedures <br /> In the event of an emergency; the following emergency procedures should be <br /> followed. Personnel on site should use the "buddy" system (pairs). Buddies <br /> should prearrange hand signals or other mean of communication. In emer- <br /> gencies the following hand signals are suggested: <br /> - Hand gripping throat: out of air, can't breathe. <br /> - Grip partner's wrist or place both hands around waist: leave area <br /> immediately, no debate! <br /> - Hands on top of head: need assistance. <br /> - Thumbs up: OK, I'm all right, I understand. <br /> - Thumbs down: No, negative. <br /> Site work areas entrance and exit routes will be planned and emergency escape <br /> routes delineated by the Project Manager. These routes will be shown to all on- <br /> site personnel by the SSO. <br /> Visual contact will be maintained between "pairs" on site with the team remain- <br /> ing in close proximity in order to assist each other in case of emergencies. <br /> In the event that any member of the field crew experiences any adverse effects <br /> or symptom of exposure while on-site, the entire field crew should immediately <br /> halt work and act according to the instructions provided by the PSO. <br /> Wind indicators visible to all on-site personnel will be provided by the Project <br /> Manager to indicate possible routes for upwind escape. <br /> The discovery of any condition that would suggest the existence of a situation <br /> more hazardous than anticipated, should result in the evacuation of the field <br /> team and re-evaluation of the hazard and the level of protection iequired. <br /> In the event that an accident occurs, the PSO is to complete an Accident Report <br /> Form for submittal to the Project Manager, Client Project Coordinator, and <br /> WHF Environmental Consultant's office. <br />
The URL can be used to link to this page
Your browser does not support the video tag.