My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0080748 SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SUGAR
>
9375
>
2600 - Land Use Program
>
SR0080748 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2020 9:47:17 AM
Creation date
12/6/2019 10:12:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0080748
PE
2602
STREET_NUMBER
9375
Direction
W
STREET_NAME
SUGAR
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21216017
ENTERED_DATE
6/14/2019 12:00:00 AM
SITE_LOCATION
9375 W SUGAR RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br />civil, <br />Environmental <br />£t Water <br />Resources <br />ENGINEERING CORP. <br />TO: Linda Turkatte, REHS <br />Director, San Joaquin Environmental Health Department <br />FROM: Norman Hantzsche, PE, Questa Engineering Corporation <br />DATE: August 15, 2019 <br />SUBJECT: OWTS Design Review for Holly Commerce Center, E&E Trading <br />PROJECT OVERVIEW <br />The project is for the construction of a large commercial/industrial building (E&E Trading) on an <br />approximately 42 -acre site, within the Holly Commerce Center. The essentially flat building site <br />is currently has been used in the past for agriculturally -related activities. The proposed <br />building(s) will cover approximately 22 acres, with nearly all of the remaining area around the <br />buildings occupied by paved driveways, parking, loading and storage area. Some amount of <br />unpaved area is provided for landscaping and for the onsite wastewater disposal field, to be <br />located in the northwest corner of the site. Storm drainage from the site will be collected and <br />routed to a large detention/retention basin located along the western side of the site. <br />OWTS DESIGN (Siegfried Engineering Inc., dated June 12, 2019) <br />Sanitary wastewater generated by the project is assumed to be from employee restroom use. <br />According to the Sanitary Sewer Design by Siegfried Engineering, wastewater from four <br />different building areas will be collected and treated in septic tanks (4), with the effluent from all <br />tanks routed by gravity to the northwest corner of the site. The combined effluent will be <br />collected in a large surge/dosing and then pumped into a series of shallow gravel "'filter beds" <br />for disposal. Major elements of the system include: <br />• Wastewater flow: Average daily wastewater flows are estimated based on plumbing <br />fixture units (12 for each per "Office Area") at 240 gpd per Office Area; 960 gpd total for <br />the entire building. <br />• Septic tanks: One 1,500 -gal (2 -compartment) concrete tank (with effluent filter) is <br />proposed for each of the four Office Areas. <br />• Effluent Sewer: Septic tank effluent will be routed to the northwest corner of the site in a <br />system of 6" diameter gravity effluent sewer lines, with numerous manholes. <br />• Surge/Dosing Tank: A large fiberglass surge/tank lift station following the septic tank is <br />provided to pump the effluent to the disposal field via a distribution box. <br />• Disposal: A series of leachfueld "filter beds" totaling 3,240 square feet is provided for <br />effluent disposal; dimensions: 33.75 ft x 96 -ft, with 8" of drain rock below 4" perforated <br />Box 70356, 1220 Brickyard Cove Rd. Suite 206 Pt. Richmond, CA 94807 T.- 510/236.6114 F: 510/236.2423 E. Questa®QuestaEC.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.