Laserfiche WebLink
SITE IMPROVEMENT PLAN <br />SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br />FILE NUMBER: IP- 900278 <br />TO BE COMPLETED BY THE APPLICANT PRIOR TO FILING THE APPLICATION <br />Owner Information <br />Applicant Information <br />Name: Granite Construction Co. <br />Name: Robertson's Ready Mix <br />Address: <br />Address: 200 S Main Street, Suite 200 <br />Corona, CA 92882 <br />Phone: 209-373-8743 <br />Phone: 951-496-4600 <br />PROJECT DESCRIPTION <br />Proposal <br />Description of the proposed project: <br />Construction and operation of a concrete batch plant at the Granite Construction Vernalis Quarry. <br />Business name (DBA): Robertson's Ready Mix <br />Employees/Customers/Deliveries per Work Shift* <br />*(attach additional breakdown/explanation for each phase of development, seasonal production, etc. if applicable) <br />NOTE: if the proposed development is an addition to an existing facility, only list the additional increases below <br />Shift Hours <br />Days of the week <br />Number of Employees <br />Customers per Shift <br />Vehicles per Shift <br />g <br />7 <br />11 <br />0 <br />22 <br />Materials/Equipment Used <br />Describe equipment used in the project (include the number of automobiles and trucks): <br />1 skid steer, up to 11 employee cars 8 concrete trucks <br />Describe materials produced, stored or used (all hazardous materials should be identified): <br />Concrete isproduced at the site. Aggregate materials are provided by the adjacent rock quarrocessingplant. <br />Cement and fl ash are delivered on an as -needed basis. 1,00 allon diesel tank will be located at the site. <br />PROPERTY AND VICINITY DESCRIPTION <br />Property Information <br />Assessor Parcel Number(s) <br />Property Size <br />Number of Parcels <br />Project Size <br />Williamson Act Contract <br />265-08-015 <br />210 ac <br />1 <br />4 ac <br />❑ Yes Ex No <br />Property Address: <br />Existing Land Uses <br />On -Site Uses (Include Ag Crops): Rock Quarjy, Processing Plant and Asphalt Plant <br />Uses to the North: Rock QuarKy and Processing Plant <br />Uses to the East: Interstate 5 and rangeland <br />Uses to the South: Interstate 580 and Rangeland <br />Uses to the West: Rock Quarry and Rangeland <br />F:\DEVSVC\Planning Application Forms\Site Improvement Plan. Page 2 of 9 <br />(Revised 8-13-13) <br />