My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012668
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BIRD
>
37222
>
2600 - Land Use Program
>
PA-1900278
>
SU0012668
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2022 4:33:44 PM
Creation date
12/6/2019 10:13:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012668
PE
2609
FACILITY_NAME
PA-1900278
STREET_NUMBER
37222
Direction
S
STREET_NAME
BIRD
STREET_TYPE
RD
City
TRACY
Zip
95304-
APN
26508015
ENTERED_DATE
12/5/2019 12:00:00 AM
SITE_LOCATION
37222 S BIRD RD
RECEIVED_DATE
7/5/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\lsauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Ord. 3675) <br />9-884.2 - IMPROVEMENT PLAN REQUIREMENTS. <br />Improvement Plans shall be prepared by a registered civil engineer, unless waived by the Director. <br />Off-site and on-site improvements required by San Joaquin County Improvement Standards and <br />conditions of approval for the application shall be incorporated into the Improvement Plans. The plans <br />shall be reviewed and approved by the Director prior to the issuance of a building permit. A fee, as <br />specified by resolution of the Board of Supervisors, shall be required. <br />(Ord. 3675; 3697) <br />9-884.3 - REVIEW PROCEDURES. <br />Improvement Plans shall be reviewed by the Director using the Staff Review Procedure as specified <br />in Chapter 9-210. <br />(Ord. 3675) <br />9-884.4 - DEVELOPMENT REQUIREMENTS. <br />Improvement Plans prepared under the provisions of this Chapter shall incorporate the information <br />required by the conditions of approval and ordinance requirements of San Joaquin County to insure that <br />off-site and on-site infrastructure meets the minimum requirements of the County. Unless otherwise <br />specified in this Title, the use cannot be established until all conditions of approval have been complied <br />with. Improvement Plans approved under this Title are approved for a period of eighteen (18) months <br />from the date of approval. <br />(Ord. 3675) <br />9-884.5 - EXPANSION OF AN EXISTING USE. <br />(a) Requirements. In those instances involving a use that requires the preparation of Improvement <br />Plans and the Improvement Plans have previously been approved, the Director may approve <br />amendments to said Improvement Plans for the expansion or adjustment of an existing development <br />if the expansion complies with all of the following requirements: <br />(1) The existing Improvement Plans are adequate to determine the compliance of the proposed <br />expansion with all required standards and conditions. <br />(2) The building or use expansion is incidental to the existing use. <br />(3) The building or use expansion does not result in a change of use. <br />(4) The building expansion involves less than twenty-five percent (25%) increase in floor area <br />covered by the existing structures associated with the use. <br />(5) A use involves less than ten percent (10%) increase in the overall site area covered by the <br />existing use. <br />(6) The building or use expansion complies with the existing requirements of the agencies having <br />jurisdiction and any other appropriate agencies as determined by the Director of the Community <br />Development Department. <br />(b) Requirements Not Met. If the proposed expansion does not meet with the above requirements in <br />Subparagraph (a), a new set of Improvement Plans shall be required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.