civil, <br /> Environmental <br /> £t Water <br /> Resources <br /> MEMORANDUM <br /> ENGINEERING CORP. <br /> TO: Linda Turkatte, REHS <br /> Director, San Joaquin Environmental Health Department <br /> FROM: Norman Hantzsche, PE, Questa Engineering Corporation <br /> DATE: August 15, 2019 <br /> SUBJECT: OWTS Design Review for Holly Commerce Center, E&E Trading <br /> PROJECT OVERVIEW <br /> The project is for the construction of a large commercial/industrial building(E&E Trading) on an <br /> approximately 42-acre site, within the Holly Commerce Center. The essentially flat building site <br /> is currently has been used in the past for agriculturally-related activities. The proposed <br /> building(s) will cover approximately 22 acres,with nearly all of the remaining area around the <br /> buildings occupied by paved driveways, parking, loading and storage area. Some amount of <br /> unpaved area is provided for landscaping and for the onsite wastewater disposal field, to be <br /> located in the northwest corner of the site. Storm drainage from the site will be collected and <br /> routed to a large detention/retention basin located along the western side of the site. <br /> OWTS DESIGN (Siegfried Engineering Inc., dated June 12, 2019) <br /> Sanitary wastewater generated by the project is assumed to be from employee restroom use. <br /> According to the Sanitary Sewer Design by Siegfried Engineering, wastewater from four <br /> different building areas will be collected and treated in septic tanks (4), with the effluent from all <br /> tanks routed by gravity to the northwest corner of the site. The combined effluent will be <br /> collected in a large surge/dosing and then pumped into a series of shallow gravel "'filter beds" <br /> for disposal. Major elements of the system include: <br /> • Wastewater flow: Average daily wastewater flows are estimated based on plumbing <br /> fixture units (12 for each per"Office Area") at 240 gpd per Office Area; 960 gpd total for <br /> the entire building. <br /> • Septic tanks: One 1,500-gal (2-compartment) concrete tank (with effluent filter) is <br /> proposed for each of the four Office Areas. <br /> • Effluent Sewer: Septic tank effluent will be routed to the northwest corner of the site in a <br /> system of 6" diameter gravity effluent sewer lines, with numerous manholes. <br /> • Surge/Dosing Tank: A large fiberglass surge/tank lift station following the septic tank is <br /> provided to pump the effluent to the disposal field via a distribution box. <br /> • Disposal: A series of leachfueld"filter beds"totaling 3,240 square feet is provided for <br /> effluent disposal; dimensions: 33.75 ft x 96-ft, with 8" of drain rock below 4"perforated <br /> 1 <br /> Box 70356, 1220 Brickyard Cove Rd.Suite 206 Pt. Richmond, CA 94807 T.-510/236.6114 F:510/236.2423 E.Questa®QuestaEC.com <br />