Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form . The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> UST Monitoring Site Plan <br /> Site Address: Pacific Service Station 6131 PACIFIC AVENUE STOCKTON CA 95207 <br /> -Amy item* tmdar�wround that are not vinble to tate <br /> . certifirine technician are a professional opinion only and <br /> • - - are solely for infix tion! purposes. Drauving not to <br /> ' ' scale. <br /> - - - C <br /> 87 0 <br /> o <br /> OQ ✓/ L <br /> . . . . DIE <br /> A = AMNIMAR I I b I • ' ' - • *PIPLliG4 <br /> F = FMLS TL (ARROWS) <br /> T = TURBINE Drawing of piping <br /> P = PROBE c exit of sump and <br /> V = VAPOR UDC's. No <br /> X = SLA IP SENSOR . . . _ . . - - - _ _ - _ tmdarg:ound <br /> L = Leak Detector drauartg is <br /> ai = nfanway <br /> B = Brine Sensor cannot speculate <br /> I = Smart Sensor blue prints. <br /> S = STP PACUIC A1'EA-IIE :j <br /> C = Floats At Chains ' I <br /> E = E Stop A?W ftems underground that aro nor t•isfbld to the cerrj!S.Tfng reclvtfcian are a <br /> prgfassfonal opinion onbi mid me sole{v for frl!or narfoPUd jnaposes. Drairbw <br /> not to scald <br /> Date map was drawn: 815/19 <br /> Instructions <br /> If you already have a diagram that shows all required Information, you may include ii, rather than this page, with your Monitoring System Ceri ficaYroa On your site plan , <br /> shown the general layout of tanks and piping. Clearly identify IocaHcre of the following equpment, if installed: mon;to&g system control panels: sans-ors monitoring tank <br /> annular spaces, stsnps, dispenser pars, spilt mntainars, or other secendarE containment areas: mechanical or e!e_c1rontc line leak detectors; and in-tank liquid level! <br /> piohes (if used for feakdelection). In the spat* provided, note the date this Site Plan was prepared. <br /> LEGEND <br /> i <br />