My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MINER
>
1950
>
2900 - Site Mitigation Program
>
PR0523303
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 1:58:57 PM
Creation date
12/6/2019 1:57:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0523303
PE
2950
FACILITY_ID
FA0015736
FACILITY_NAME
THERMO-KING STOCKTON
STREET_NUMBER
1950
Direction
E
STREET_NAME
MINER
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15308006
CURRENT_STATUS
02
SITE_LOCATION
1950 E MINER AVE
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Safety and Health Plan <br /> Petroleum Hydrocarbon Contamination <br /> Terracon Project#67047008 <br /> Page 3 <br /> requirements shall be made by Terracon Project Manager and Corporate Safety and Health <br /> Manager. Adoption 9f this Site Safety and Health Plan by subcontract employers shall not relieve <br /> any site subcontractor for the responsibility for the health and safety of its employees. <br /> 2.0 SAFETY AND HEALTH ADMINISTRATION <br /> The Project Manager is ultimately responsible for seeing that work on this project is performed <br /> in accordance with the safety and health provisions contained in this Plan. The designated Site <br /> Safety and Health Officer (SSO) will monitor compliance with this Plan during field activities. All <br /> field team members engaged in project activities will be required to sign the "Acknowledgment <br /> of Instruction" form included with this Plan. The SSO will ensure that a copy of this Plan is <br /> available on site for the duration of project activities. <br /> Terracon and subcontractor task leaders (if any)will be responsible for: <br /> • Providing subordinate personnel a copy of this Plan, and briefing them on its content. <br /> • Enforcing the applicable provisions of this Plan. <br /> • Inspecting and maintaining equipment in compliance with applicable federal, state or local <br /> safety regulations. <br /> • Enforcement of corrective actions. <br /> • Investigation of accidents or injuries. <br /> The following individuals will be responsible for implementation and enforcement of the Plan: <br /> TITLE NAME PHONE <br /> Project Manager: Joe McGee 775-250-6105 <br /> Terracon Safety and Health Manager: Gary K. Bradley,CSP, CHMM 913-599-6886 <br /> Site Safety and Health Officer: Joe McGee 775-250-6105 <br /> Terracon Task Leader(s): Joe McGee 775-250-6105 <br /> Subcontractor Task Leader: Vironex, Inc. (driller) 510-568-7676 <br /> If hazardous conditions develop during the course of project activity, the SSO in conjunction <br /> with the Terracon Corporate Safety and Health Manager, will coordinate actions required to <br /> safeguard site personnel and members of the general public. Additional safety measures will be <br /> verbally communicated to all project personnel, recorded in writing and appended to this Plan. <br /> 3.0 MEDICAL SURVEILLANCE REQUIREMENTS <br /> All Terracon personnel participating in this project shall be enrolled in a health monitoring <br /> program in accordance with the provisions of OSHA 29 CFR 1910.120 and 1910.134. Each <br /> project participant shall be certified by a Doctor of Medicine as fit for respirator and semi- <br />
The URL can be used to link to this page
Your browser does not support the video tag.