My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
F
>
5491
>
3500 - Local Oversight Program
>
PR0545028
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 2:59:14 PM
Creation date
12/6/2019 2:48:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0545028
PE
3528
FACILITY_ID
FA0003919
FACILITY_NAME
VAN DE POL ENTERPRISES
STREET_NUMBER
5491
STREET_NAME
F
STREET_TYPE
ST
City
BANTA
Zip
95304
CURRENT_STATUS
02
SITE_LOCATION
5491 F ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Moore Petroleum -2- July 27, 2001 <br /> Claim No. 000889 <br /> COST PRE-APPROVAL BREAKDOWN <br /> # Task* Amount Pre-Approved Comments <br /> 1 Reinstallation of Well MW-7 as $3,953 <br /> Vapor Well VEW-4 <br /> 2 SVE System Installation $10,668 <br /> 3 System Permitting $3,469 <br /> 4 SVE System Operation& $86,628 <br /> Maintenance 12 events <br /> 5 Monitoring Well Groundwater $19,198 <br /> Sampling 4 events <br /> 6 Prepare 4 Groundwater Monitoring $5,600 <br /> Reports <br /> TOTAL PRE-APPROVED $129,516 <br /> * Task descriptions are the same as those identified in Apex Envirotech's July 16,2001 cost estimate. <br /> • Only the tasks/costs reflected on the above table are pre-approved at this time. The Fund will <br /> review any tasks/costs that go beyond the pre-approved amount to be determined if the <br /> additional tasks and costs are necessary and reasonable. However, if costs exceed the above <br /> pre-approved amounts, the Fund will be unable to expedite your Reimbursement Request. <br /> • The work products must be acceptable to the County and the Regional Water Quality Control <br /> Board. <br /> • If a different scope of work becomes necessary, then you must request pre-approval of costs <br /> on the new scope of work. <br /> • Although I have referred to the Apex Envirotech proposal in my pre-approval above, please <br /> be aware that you will be entering into a private contract: the State of California cannot <br /> compel you to sign any specific contract. This letter pre-approves the costs as presented in <br /> the proposal dated July 16, 2001 by Apex Envirotech for conducting the work approved by <br /> the County for implementing the June 1, 2001, Apex Envirotech workplan. <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in <br /> the Reimbursement Request Instructions to confirm that the costs are consistent with this pre- <br /> approval before you will be reimbursed. Please insure that your consultant prepares their <br /> invoices to include the required breakdown of costs on a time and materials basis, that <br /> California En viroamentaiProtectioa Agency <br /> Z4' Recrc%d Pape, <br />
The URL can be used to link to this page
Your browser does not support the video tag.