Laserfiche WebLink
F <br /> plan describes 1) personnel responsibilities, and 2) protective equipment to be worn as appropriate <br /> when working on the site. <br /> 4.1 Personnel Responsibilities <br /> Key personnel directly involved in the investigation who will be responsible for monitoring the <br /> execution of safe work.practices and the provisions of this plan are: 1) the drilling-subcontractor <br /> project supervisor and 2) the Delta project field manager. These personnel are responsible for <br /> knowing the provisions of the plan, communicating plan requirements to workers under their <br /> supervision and to site visitors, and for enforcing the plan. <br /> 4.2 Personnel Protection <br /> The designated personnel-protective equipment is selected to prevent field personnel from exposure <br /> to gasoline fuel products that may be present at the site. To prevent direct skin contact, the <br /> following protective clothing will be worn as appropriate while working at the site: <br /> r <br /> 1) Hard hat with optional face shield <br /> 2) Tyvek coveralls <br /> 3) Butyl rubber or disposable vinyl gloves <br /> 4) Steel toe boots <br /> 5) Goggles or safety glasses (if optional face shield not used on the hard hat) <br /> The type of gloves used will be determined by the type of work being performed. Drilling person- <br /> nel will be required to wear butyl rubber gloves because they will have long-duration contact with <br /> the subsurface materials. Delta sampling personnel will wear disposable gloves when handling any <br /> sample. These gloves will be changed between each sample. <br /> Personnel-protective equipment shall be put on before entering the immediate work area. The <br /> sleeves of the coveralls shall be outside of the cuffs of the gloves to facilitate removal of clothing <br /> with the least potential contamination of personnel. If at any time protective clothing (coveralls, <br /> boots, or gloves) becomes torn, wet, or excessively soiled, it will be replaced immediately. <br /> Total organic vapors will be monitored at the site with a portable photoionization detector. Should <br /> the total organic vapor content approach that of the threshold limit value (TLV) for any of the <br /> substances listed in Table C-1, appropriate safety precautions will be carried out under the direction <br /> of the site project leader. These precautions include, but are not limited to, the following: 1) <br /> Donning of respirators (with appropriate cartridges) by site personnel, 2) forced ventilation of the <br /> site, 3) shut-down of work until such time as appropriate safety measures sufficient to insure the <br /> health and safety of site personnel can be implemented. <br />