My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
F
>
5491
>
3500 - Local Oversight Program
>
PR0545028
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 2:55:47 PM
Creation date
12/6/2019 2:50:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545028
PE
3528
FACILITY_ID
FA0003919
FACILITY_NAME
VAN DE POL ENTERPRISES
STREET_NUMBER
5491
STREET_NAME
F
STREET_TYPE
ST
City
BANTA
Zip
95304
CURRENT_STATUS
02
SITE_LOCATION
5491 F ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Workplan for a Limited Subsurface Site Investigation <br /> Moore Petroleum,5491 F Street,Banta, California <br /> Page 2 <br /> On May 5, 1995, a soil vapor extraction(SVE) system consisting of an R.S.I. SAVE system was <br /> installed at the subject site. The SVE system was installed per San Joaquin Valley Unified Air <br /> Pollution Control District (SJVUAPCD) permit conditions. The SVE system consisted of an <br /> internal combustion engine with catalytic converters mounted on the exhaust. The system was <br /> configured such that soil vapors could be extracted from either vapor well VEW-1 and/or <br /> monitoring well MW-1. The system was started on May 5, 1995, and operated through October <br /> 4, 1995, at which time it was temporarily removed from the site. On November 27, 1995, the <br /> system was returned to the subject site and restarted. <br /> An air sparge system was installed for use in conjunction with the SVE system. The air sparge <br /> system consisted of a one horse power electric motor which powers a 10-cubic feet per minute <br /> (cfm) oil-less compressor. The compressor injected air through an air sparge point located <br /> midway between VEW-1 and MW-1 (Figure 2). The air sparge system was started on May 31, <br /> 1995 and operated intermittently through August 30, 1995, at which time its operation began to <br /> coincide with the operation of the R.S.I. system. <br /> On April 29, 1997, Apex received permission from the SJCEHD to shut down the air sparge and <br /> vapor extraction system due to low influent soil vapor concentrations to the SVE system. As of <br /> April 29, 1997, the remediation system had extracted a total of 1,730 pounds of total petroleum <br /> hydrocarbons (TPH), as gasoline, and 19.9 pounds of benzene. <br /> Apex submitted the report titled, Over Excavation & Groundwater Removal Workplan, dated <br /> September 10, 1997, proposing over excavation, de-watering and sampling of the bulk loading <br /> rack and tank basins during the removal of nine underground storage tanks (UST). <br /> Apex supervised the removal of two 350 gallon USTs, T-8 and T-9 (kerosene and cleaning <br /> solvent, respectively) on August 17, 1998 and September 8, 1998, respectively. Also, seven <br /> 10,000 gallon USTs were removed on September 8, 1998. Results of the UST removal were <br /> documented by Apex in the report titled, Tank Closure Results and Recommendations Report, <br /> dated December 23, 1998. <br /> Following the removal of T-9, soil was over excavated and an exploratory trench was dug. Apex <br /> collected two soil samples and one groundwater sample from the over-excavation and <br /> exploratory trench. One soil sample was collected from beneath T-8. After the removal of the <br /> seven 10,000 gallon USTs, Apex collected four soil samples and one groundwater sample from <br /> the tank pit. Apex then collected six additional soil samples and two additional water samples <br /> from beneath the tank basin. Nine soil samples from the area beneath the former bulk loading <br /> rack were submitted for analysis. The results of all soil and water sampling were documented in <br /> the report titled, Tank Closure Results and Recommendations Report, dated December 23, 1998. <br /> On April 8 and 9, 1999, Apex personnel supervised the advancement of eight soil borings at the <br /> subject property. The results of all soil and water sampling were documented in the report titled, <br />
The URL can be used to link to this page
Your browser does not support the video tag.