My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
F
>
5491
>
3500 - Local Oversight Program
>
PR0545028
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 2:55:47 PM
Creation date
12/6/2019 2:50:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545028
PE
3528
FACILITY_ID
FA0003919
FACILITY_NAME
VAN DE POL ENTERPRISES
STREET_NUMBER
5491
STREET_NAME
F
STREET_TYPE
ST
City
BANTA
Zip
95304
CURRENT_STATUS
02
SITE_LOCATION
5491 F ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Workplan for a Limited Subsurface Site Investigation <br /> Moore Petroleum, 5491 F Street,Banta, California <br /> Page 5 <br /> Analysis Performed: <br /> Analysis Abbreviation Designation USEPA Method No. <br /> Total Petroleum Hydrocarbons TPHg <br /> as Gasoline <br /> Total Petroleum Hydrocarbons TPHd Gas/Diesel- <br /> as Diesel <br /> Total Petroleum Hydrocarbons Range 8015 Modified <br /> as Kerosene Kerosene Hydrocarbons <br /> Total Petroleum Hydrocarbons TPHmo <br /> as Motor Oil <br /> Benzene <br /> Toluene Aromatic <br /> BTEX Volatile 8020 <br /> Eth (benzene <br /> Xylenes (Total) Organics <br /> Tertiary Butyl Alcohol TBA <br /> Methyl Tertiary Butyl Ether MTBE Fuel <br /> Di-isopropyl Ether DIPE Oxygenates <br /> Ethyl Tertiary Butyl Ether ETBE 8260B <br /> Tertiary Amyl Methyl Ether TAME <br /> 1,2-Dichloroethane 1,2 - DCA Lead <br /> Eth lene Dibromide EDB Scaven ers <br /> Drill cuttings from monitoring well borings will be temporarily stockpiled on site, on and under <br /> plastic sheeting, pending receipt of the analytical results. A composite soil sample from the <br /> stockpiled drill cuttings will be analyzed for the analyses listed above including total lead, EPA <br /> method 6010. The drill cuttings will be properly disposed pending receipt of analytical results. <br /> Auger decontamination, development and purge water will be temporarily stored on-site in <br /> approved Department of Transportation 55-gallon drums pending receipt of the analytical results. <br /> The water will be properly disposed pending receipt of analytical results of soil and groundwater <br /> sampling. <br /> PRELIMINARY INVESTIGATION AND EVALUATION REPORT <br /> Upon completion of monitoring wells MW-13 through MW-17, Apex will prepare a Preliminary <br /> Investigation and Evaluation Report (PIER) documenting the results of all work performed in <br /> Tasks 1 and 2. This report will be prepared according to the Appendix A —Reports, Tri-Regional <br /> Board Staff Recommendations for Preliminary Investigation and Evaluation of Underground <br /> Tank Sites. <br /> HEALTH AND SAFETY PLAN <br /> A Health and Safety Plan for this site work is included as Appendix C. <br />
The URL can be used to link to this page
Your browser does not support the video tag.