Laserfiche WebLink
Workplan for Ozone Sparging . <br /> Moore Petroleum Bulk Plant,5491 F Street,Banta,California <br /> Page 8 <br /> REMARKS/SIGNATURES <br /> The information contained within- this report reflects our professional "opinions" and was , <br /> developed in accordance with currently 'available information, and•accepted hydrogeologic and <br /> engineering practices. This report was prepared solely for the use of Moore Petroleum. Any, ' <br /> reliance on this report by parties other than Moore Petroleum will be at their own risk.' <br /> The work described above was performed under the direct supervision of the' professional <br /> geologist,registered with the State of California, whose signature appears below.-'. <br /> We appreciate the opportunity to provide - Moore Petroleum geologic, engineering and <br /> environmental consulting services, and trust .this report'meets your needs. If you have any <br /> questions or comments, please call us at (916) 851-0174. <br /> Sincerely, t r <br /> APEX ENVIROTECH,INC. <br /> Scott R� ��� <br /> nine <br /> Project Manager �R�D ® <br /> M1 HAEL <br /> SGOURAKIS <br /> No V94 <br /> Michael S. Sgourakis, R.G. <br /> Senior Project Manager. OF C�►�� <br /> CRG No. 7194 . <br />