Laserfiche WebLink
Vamp, <br /> MW-11�✓0 <br /> e <br /> y, Radius p <br /> Influence <br /> / 0 W-9� <br /> Storage co <br /> Tanks ��� 0� <br /> -7' 'I� 600VEW-2� <br /> 2, co <br /> �� •5� � t <br /> \74- MW-10 p talon ser <br /> / Remediation RW-2 ' <br /> Compound '� Former �� 6 �'� MW-12 <br /> Cleaning \(� �� �. <br /> Solvent UST ?' <br /> YL f MW-6 '� Kerosene VEW-3/MW-8 <br /> usr \� Building �" 1'� MW-3 <br /> MW-1 <br /> AS-1 1% ',.,. Planter <br /> VEW-1 Former <br /> �c Gate VEW-4/MW-7 =' �� Underground <br /> MW-2 MW-5 Storage Tanks <br /> �.5 <br /> F <br /> 511 <br /> f <br /> LEGEND <br /> Proposed Ozone Sparge Well Location <br /> + Monitoring Well Location <br /> Vapor Extraction Well Location <br /> N ?Si Recovery Well Location <br /> 0 50 100 ?8( Air Sparge Well Location <br /> •----- Remediation Piping <br /> Approximate Scale <br /> 1 inch = 50 feet <br /> Source: Figure Modified From Survey Provided By Morrow Surveying. <br /> DRAWN BY: D. Alston <br /> 9 <br /> DATE: 9PROPOSED OZONE SPARGE FIGURE <br /> /12/03 SYSTEM PLAN <br /> REVISIONS 3 <br /> ///AAPX Moore Petroleum <br /> ENVIROTECH, INC. 5491 F Street PROJECT NUMBER: <br /> Banta, California ERA02.004 <br />