Laserfiche WebLink
SANJOAQUIN <br /> CCUNTY Environmental Health Department <br /> Greatness grows here. <br /> 7.5 Discussion of total potential nitrate impact from proposed project. f <br /> 7.6 Discussion of the potential nitrate loading results relative to the disposal of wastewater. <br /> 7.7 Description of the methods proposed to mitigate any known or future impact to soil and <br /> groundwater from nitrate, and/or any other constituent of concern, at and/or around the project <br /> site. <br /> 8.0 The report was signed, dated and stamped by a qualified environmental professional.The r <br /> attachments/appendices contain sufficient documentation to support claims made in the report. <br /> Site Map Elements: <br /> • Legal parcel showing all existing lot lines <br /> • size, project size, current zoning, identification and current use and occupancy of all structures on the <br /> property, including which structures have installed plumbing systems,topography, current and proposed <br /> number of employees/visitors, number, use and status of all water wells within 600' of property line, <br /> number and status of all OWTS within 600' of property line, name and proximity of any water way or canal <br /> within 2,500' of the property line. <br /> EHD 26-02-002 Page 4 of 2 Nitrate Loading Study Checklist <br /> 7/14/2003 <br />