Laserfiche WebLink
•� 4 <br /> 1 !4 P11 11: 05 <br /> APEX <br /> 1844 Madison Avenue,Suite 106 • Fair Oaks,(A 95628 <br /> E N V I R 0 T E C H , INC . 1.800.242.5249 • Ph.916.535.0200 • Fax 916.535.0207 <br /> August 9, 1996 <br /> Mr. Jerry Moore <br /> Moore Petroleum, Inca <br /> 5491 "F" Street <br /> Banta, California 95304 <br /> Subject: ' Third Quarter 1996 Groundwater Monitoring & . <br /> Remediation Status Report <br /> Moore Petroleum, Inc. <br /> 54917 Street, Banta, California <br /> Apex Project No. ERA02.004 <br /> Dear Mr. Moore: . <br /> Apex Envirotech,Inc. (Apex), is pleased to provide Moore Petroleum, Inc. (Moore Petroleum), <br /> this report documenting the results of the quarterly groundwater monitoring conducted on July <br /> 19, 1996, at the subject site(Figure 1). The monitoring included collection of depth-to- <br /> groundwater measurements and groundwater sample collection from monitoring wells MW-1 <br /> through MW-6 located on site(Figure 2). This report also contains the quarterly results(June <br /> and July 1996) of the vapor extraction and air sparging systems to date. <br /> This report is based, in part, on information obtained from Moore Petroleum, and is subject to <br /> modification as newly acquired information may warrant. <br /> BACKGROUND <br /> Apex began work on the project with the groundwater monitoring conducted on January 14, <br /> 1994. Prior to Apex,work conducted at the site included subsurface investigations and <br /> groundwater monitoring by Earth Treatment Systems, Inc., of Manteca, California;Delta <br /> Environmental Consultants, Inc., of Rancho Cordova, California;Nations Groundwater <br /> Associates of Sacramento, California;and Aegis Environmental, Inc. (Aegis), of Roseville, <br /> California. Site details may be found in a "Quarterly Groundwater Monitoring Report," dated <br /> April 18, 1991, submitted to Moore Petroleum by Aegis. <br /> .J <br />