My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011878
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
F
>
5491
>
3500 - Local Oversight Program
>
PR0545028
>
ARCHIVED REPORTS_XR0011878
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 5:55:37 PM
Creation date
12/6/2019 4:52:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011878
RECORD_ID
PR0545028
PE
3528
FACILITY_ID
FA0003919
FACILITY_NAME
VAN DE POL ENTERPRISES
STREET_NUMBER
5491
STREET_NAME
F
STREET_TYPE
ST
City
BANTA
Zip
95304
CURRENT_STATUS
02
SITE_LOCATION
5491 F ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Third Quarter 21105 Groundwater Monitoring and Remediation Status Report <br /> f , Moore Petroleum Bulk Plant,5441 F Street,Banta,California <br /> Page 7 <br /> REMEDIATION SYSTEM SUMMARY <br /> Soil Vapor Extraction System <br /> System description: <br /> Petroleum vapors are extracted from the subsurface through three monitoring/vapor wells (VEW- <br /> 3/MW-8, MW-1, and VEW-4/MW-7) and two vapor extraction wells (VEW-1 and VEW-2). <br /> The wells are manifolded together with PVC piping in the remediation compound before <br /> connecting to the extraction system. The vapor extraction system is a 57'horsepower regenerative <br /> blower manufactured by Rotron-Ametek®Model number EN6F72L. Activated carbon <br /> adsorption abates the volatile organic compounds extracted by the SVE system. The system is <br /> operating under the authority of the SJVAPCD, Authority to Construct#N 560-8-2. <br /> System startup date: June 17, 2002 <br /> Current system mode: Carbon abatement (September 29,',2004) <br /> Active extraction wells: VEW-2, VEW-3, VEW-4 <br /> Inactive extraction wells/reason: MW-1, VEW-1.system optimization, zero concentrations <br /> Status of system operation during reporting period/ reasons for downtime: <br /> The SVE system did not operate continuously during this reporting period. Apex personnel shut <br /> the system off for the period in-between site visits to allow for rebound to occur, due to the lack <br /> of volatile organic vapors being recovered from the SVE system. According to hour meter <br /> readings recorded in the field the SVE system operated for a total of 100 days between June 9, <br /> and August 15, 2005. <br /> Vapor Analysis Performed: <br /> Anal sis Abbreviation Designation USEPA Method No. <br /> Total Petroleum Hydrocarbons TPH Gas-Range <br /> as Gasoline g Hydrocarbons <br /> Benzene <br /> Toluene Aromatic <br /> BTEX Volatile 82608 <br /> Eth (benzene <br /> Xylenes (Total) Organics <br /> Methyl Tertiary Butyl Eer:= <br /> MTBE Fuel <br /> Ox genate <br /> All effluent samples collected during this reporting period were reported as containing no <br /> concentrations above laboratory detection limits. <br />
The URL can be used to link to this page
Your browser does not support the video tag.