Laserfiche WebLink
Third Quarter 2005 Groundwater Monitoring and Remediation Status Report <br /> Moore Petroleum Bulk Plant,5491 F Street,Banta,California <br /> [\r�� Page 9 <br /> RECOMMENDATIONS <br /> Apex recommends continued groundwater monitoring to confirm laboratory data and monthly <br /> groundwater sampling of the domestic well. The next monitoring event is scheduled for <br /> November 2005, and will include newly installed groundwater monitoring wells MW-13 through <br /> MW-17, <br /> ADDITIONAL ACTIVITES PERFORMED AT SITE <br /> A results report documenting field activities is pending the installation,of groundwater <br /> monitoring well MW-15. <br /> ATTACHMENTS: <br /> Figure 1: Site Vicinity Map <br /> Figure 2: Site Plan Map <br /> :Figure 3: Groundwater Contour Map: August 31, 2005 <br /> Figure 4: TPHg in Groundwater Iso concentration Map: August 31, 2005 <br /> Figure 5: TPHd in Groundwater Isoconcentration Map: August 31, 2005 Y <br /> Figure 6: TPHmo in Groundwater Isoconcentration Map: August 31, 2005 <br /> Figure 7: TPHkerosene in Groundwater Isoconcentration Map: August 31, 2005 <br /> Figure S: Benzene in Groundwater Iso concentration Map: August 31, 2005 <br /> Figure 9: MTBE in Groundwater Isoconcentration Map: August 31, 2005 <br /> Table 1: Well Construction Details ; <br /> Table 2: Groundwater Elevation Data <br /> Table 3: Groundwater Analytical Data <br /> Table 4: Historical Groundwater Elevation Data <br /> Table 5: Historical Groundwater Analytical Data <br /> Table 6: Vapor Extraction Data <br /> Appendix A: Apex Standard Operating Procedures <br /> Appendix B: Field Data Sheets <br /> Appendix C: Laboratory Analytical Reports and Chain-of-Custody Forms <br />