Laserfiche WebLink
y <br /> � � 1 <br /> F <br /> CALIFORNIA LABORATORY SERVICES <br /> 05/31/05 11:16 <br /> APEX Envirotech Inc.-Gold River Project: Moore Petroleum <br /> CLS Work Order#: COE0712 <br /> 11244 Pyrites Way Project Number: ERA02.004 <br /> Gold River,CA 95670 Project Manager: Rich Johnson COC#: <br /> Notes and Definitions <br /> = r <br /> QM-05 The spike recovery was outside acceptance limits for the MS and/or MSD due to matrix interference.The LCS and/or LCSD were <br /> within acceptance limits showing that the laboratory is in control and the data is acceptable. <br /> DET Analyte DETECTED <br /> ND Analyte NOT DETECTED at or above the reporting limit <br /> NR Not Reported <br /> dry Sample results reported on a dry weight basis <br /> RPD Relative Percent Difference <br /> h <br /> 4 <br /> II <br /> 1 <br /> I <br /> 1 <br /> i <br /> f <br />