Laserfiche WebLink
1 <br /> TABLE 1 t <br /> WELL CONSTRUCTION DETAILS <br /> .., Moore Petroleum Bulk Plant <br /> 5491 F Street <br /> Banta, California /IIF <br /> c. . <br /> Well Total Casing Screened Filter Pack <br /> Installation *Elevation Casing Depth Well Depth Diameter Interval Interval <br /> Well Number Date TOC (feet) Material (feet) (feet) (inches) (feet) (feet) <br /> MW-1 8/9/1988 29.74 PVC 20 20 2 5-20 3.5-20 <br /> PVC! <br /> MW-2 4/8/1989 29.95 0.01 Oscreen 26.5 26.5 2 6-26 4-26 <br /> j PVC1 <br /> MW-3 4/8/1989 29.08 0.010screen 26.5 26.5 2 6-26 4-26 <br /> PV,CI I <br /> MW-4 6/12/1990 29.36 0.010screen 24.18 24.18 2 4.1 -24.18 2.1 -24,18 <br /> MW-4A 10/19/1999 29.36 PVC 25 20 --- --- -- <br /> PVC1 { <br /> MW-5 6/11/1990 29.39 0.010screen 24.94 24.94 2 4.86-24.94 2.86-24.94 <br /> PVC/ <br /> MW-6 6/11/1990 29.29 0.010screen 25.17 25.17 2 4.53-25.17 2.53-25.17 <br /> MW-7NEW-4 10/19/1999 29.77 PVC 20 20 2 5-20 --- , <br /> MW-8NEW-3 10/19/1999 28.98 PVC 20 20 4 5-20 --- <br /> MW-9 10/19/1999 28.28 PVC 25 20 --- 5-20 <br /> - <br /> MW-10 7126100 29.10 PVC 20 20 2 57'20 3-20 i <br /> MW-11 7126100 29.15 PVC 20 20 2 5.20 3-20 <br /> MW-12 7/25100 28.86 PVC 20 20 2 5 7"20 3-20 <br /> VEW-1 9/30/1994 --- PVC 14 14 4 4714 3- 14 <br /> VEW-2 1111101 28.69 PVC 21 20 4 5720 3.5-20 <br /> RW-2 1112101 28.53 PVC 31 30 6 10:30 B-30 <br /> ��. OS-1 May-95 --- --- --- --- --- --- --- <br /> OS-2 12/9/2004 --- PVC 25 24 314 inch 21.5-24 19.5-25 <br /> OS-3 12/9/2004 --- PVC 25 24 314 inch 21.5-24 19.5-25 <br /> OS-4 12/9/2004 --- PVC 25 24 314 inch 21.5-24 19.5-25 <br /> OS-5 12/9/2004 --- PVC 25 24 3/4 inch 21.5-24 19.5-25 <br /> OS-6 12/8/2004 --- PVC 25 24 314 inch 21.5-24 19.5-25 <br /> OS-7 12/8/2004 --- PVC 25 24 3/4 inch 21.5-24 19.5-25 <br /> OS-8 12/8/2004 --- PVC 25 24 374 inch 21.5-24 19.5-25 <br /> OS-9 12/10/2004 --- PVC 25 24 314 inch 21.5-24 19.5-25 <br /> OS-10 12/10/2004 --- PVC 25 24 314 inch 21.5-24 19.5-25 <br /> Notes: <br /> *=surveyed by Morrow Surveying to mean sea level 10101 } <br /> ---= Information not found a <br /> TOC=Top of Casing <br /> PVC= Polyvinyl Chloride <br /> Earth Treatment Systems, Inc.installed MW-1. <br /> Delta Environmental Consultants, Inc. installed MW-2& MW-3 i <br /> Nations Groundwater Associates/Aegis Environmental Inc. installed MW-4 through MW-6 <br /> To define the vertical extent of soil contamination,a 39 foot deep boring (called SB-Deep)was advanced near MW- <br /> 81VEW-3 on 7126100. Results beyond 20 feet bgs were non-detect for contaminants of concern. Details are included in <br /> the Apex Third Quarter 2000 QMR (R:IGOLD RIVERIOLD PROJECT FILES(PRE 2003)IMIKE SGOLIRAKISIApex <br /> projects\era02.004\resuIts report 8-OO1Res-QMRept.Q3.doc) <br /> t <br /> I APEX ENVIROTECH INC. <br /> Page 1 10 1 ERA02.004 <br />