Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> MS-90-78 <br /> PAGE TWO <br /> a . Connection to an approved public water supply system is <br /> required . A letter form the water supplier will be requried <br /> stating that they have the capacity to serve the development <br /> and that the system meets State standards prior to recording <br /> of the final map. <br /> b. Connection to a public sewer system i, required . A will <br /> serve letter is required from the sewer district stating <br /> that they have the capacity to serve the proposed project <br /> prior to recording the final map . <br />