w 0971c*-6 <br /> 5.0 TENTATIVE SCHEDULE <br /> Sampling will commence approximately three weeks after State and Local <br /> agency approval of the sampling plan. We estimate the time schedule as <br /> follows: <br /> Phase I Sampling 8 work days <br /> Phase I Analysis 15 work days <br /> Phase II Sampling 9 work days <br /> Phase II Analysis 15 work days <br /> Draft Report 30 work days <br /> Final Report 15 work days <br /> A more definitive schedule will be provided to State and Local regulatory <br /> agencies once the Sampling Plan has received DOHS approval. Without DOHS <br /> approval we have no estimated start date. We will require this date in <br /> order to engage a driller. We propose to start as soon as State approval <br /> is acquired as is practical. <br /> 6.0 STATE AND LOCAL AGENCY COORDINATION <br /> The California State Department of Health Services (DOHS) will be given <br /> seven working days advance notice of the commencement of Phase I and II <br /> sampling. The DOHS will be advised of the work schedule at this time. <br /> Duplicate samples will be collected for DOHS. DOHS will be expected to <br /> provide its own personnel to receive the samples as well as all sample <br /> containers and appropriate preservatives and shipping containers. <br />