My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FIELD
>
1856
>
2900 - Site Mitigation Program
>
PR0523459
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 9:12:55 AM
Creation date
12/10/2019 8:56:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0523459
PE
2959
FACILITY_ID
FA0015853
FACILITY_NAME
TYCO ELECTRONICS (FORMER)
STREET_NUMBER
1856
STREET_NAME
FIELD
STREET_TYPE
AVE
City
STOCKTON
Zip
952032037
APN
13339003
CURRENT_STATUS
01
SITE_LOCATION
1856 FIELD AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0971c*-1 -SKI <br /> OCT -71985 <br /> 1 SAMPLING PLAN FOR <br /> P 4� THE FIELD AVENUE ANNEX FOR <br /> LIKA CORPORATION <br /> Stockton, California <br /> J `1Jl <br /> V 1.0 PURPOSE OF THE SAMPLING PLAN <br /> V The objectives of this sampling program are to determine the vertical and <br /> horizontal extent of contamination due to a surface spill and to <br /> 1 <br /> determine the extent of subsurface contamination, including contamination <br /> H ✓ <br /> of groundwater, resulting from leaking plumbing, and a leaking sump at <br /> the Lika Field Avenue Annex (Figure 1) . The surface spill occurred at <br /> the rear of the Field Avenue annex. It is believed that a small amount <br /> of copper sulfate solution was spilled onto the dirt strip between the <br /> foundation of the annex and the paved boat storage yard. We anticipate <br /> the contamination to be limited to the near surface. The sump, which may <br /> be the biggest source of contamination, is located in the wet process <br /> room. The sump has been attacked by the acid copper sulfate solution <br /> used in the manufacturing process and has been breached. The other <br /> source of contamination may be a deteriorated section of ductile iron <br /> pipe located beneath the concrete floor in the front of the building. <br /> The sampling plan is separated into two phases. The precise nature of <br /> the second phase will be based upon what 1s discovered in the first phase. <br /> 2.0 SAMPLING PLAN DESCRIPTION <br /> 2.1 Phase 1 <br /> This phase will examine the suspected surface contamination along the <br /> backside of the Field Avenue annex. It will also investigate whether <br /> subsurface contamination has left the facility and gotten into <br /> groundwater. <br />
The URL can be used to link to this page
Your browser does not support the video tag.