My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FILBERT
>
110
>
3500 - Local Oversight Program
>
PR0545039
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 10:15:44 AM
Creation date
12/10/2019 10:00:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545039
PE
3528
FACILITY_ID
FA0010186
FACILITY_NAME
DEL MONTE FOODS PLNT #33 - DISCO WH
STREET_NUMBER
110
Direction
N
STREET_NAME
FILBERT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15702009
CURRENT_STATUS
02
SITE_LOCATION
110 N FILBERT ST
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 5 <br /> Reporting and Schedule <br /> 5.1 Reporting <br /> t! The results of the additional sampling and analysesperformed for the Disco site will be <br /> presented in a report. The report will include cross section(s) and discussion of the nature and <br /> extent of petroleum hydrocarbon plume in groundwater, CPT logs, summary of results, <br /> laboratory analytical data sheets, and conclusions and recommendations. Any significant field <br /> decisions and modifications to this work plan will be documented in the report. j <br /> 5.2 Scheduling <br /> The work plan will be submitted to the PHS/EHD by August 30, 1999. Thirty days after non- <br /> conditional approval of the work plan,field work will begin. The final report will be <br /> submitted to the PHS/EHD,45 days after completion of the field work. The estimated time e <br /> line of the activities is presented below: <br /> Month Week of Activity <br /> ( • August Week of August 30 Work Plan submitted to PHS/EHD <br /> September Week of September 13 PHS/EHD comments and approval <br /> L October Week of October 18 Implementation of the work plan } <br /> (assumes non-conditional approval of the work <br /> plan) E <br /> November Week of November 29 Final report to PHS/EHD <br /> SECTION 6 <br /> References <br /> Central Valley Regional Water Quality Control Board, 1991,TRI-Regional Board Staff Recommendations <br /> for Preliminary Investigation and Evaluation of Underground Tank Sites,Appendix A,August <br /> Exceltech, 1985,Tank Excavation Report,Disco Sites. <br /> Le I! <br /> ! CH2M HELL, 1995,Problem Assessment Report(PAR)and Final Remediation Plan(FRP),April. <br /> i <br /> r <br /> SFO/CABERNET/GRWPSIEBGIDELMONIE/PLANT-331WORKPLAN-CPT.DOC 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.