Laserfiche WebLink
Ms.Margaret Lagorio <br /> Mr Ronald Rowe <br /> Table 1,Page 2 <br /> June 18, 1998 <br /> Table 1-Status of Del Monte Food's Responses to October 14,1997 PHS/EHD Letter Re:Disco Property <br /> Page/ Requirement/Recommendation Response <br /> Paragraph/ <br /> Sentence <br /> 2/2/10- 12 Well screen intervals shall not exceed 20' in total length.Well screen and DTSC guidance for installing monitoring wells is specified in the workplan <br /> filter pack construction shall not act as vertical or horizontal contaminant addendum. <br /> 1 transport mechanism.Preferably,monitor well screened intervals shall not <br /> •/ exceed the height of the h dro eolo is interval under investigation. <br /> 2/2/13 Once vertical characterization is approximated for each source area,lateral The workplan and addendum indicate that additional vertical characterization <br /> contaminant definition may commence. of lithology and extent of hydrocarbon constituents should begin at the area of <br /> highest known contamination,which is presumed to be the source area. <br /> 2/2/14 All wells installed and surveyed shall be referenced to an appropriate and DTSC guidance for installing monitoring wells is specified in the workplan <br /> design red benchmark. addendum. <br /> 2/2/15& 16 Report the results of your investigation to this agency within 30 days of See proposed schedule,included as Attachment B to the workplan addendum. <br /> completion of the approved scope of work. <br /> 2/3 Please note,you are requested to immediately pursue any off-site access Off-site encroachment permits can not be finalized until locations for CPT <br /> agreements that you may need to complete your investigation activities. surveys,soil borings and wells area reed to by PHS/EHD. <br /> 2/4/all You shall also evaluate the probability of the contaminants plume The well survey update submitted to PHS/EHD on March 30, 1998 provides a <br /> encountering preferential conduits that could spread the contamination detailed survey of wells in the vicinity of the Disco property. <br /> particularly in the vertical direction.The conduit study is to include a detailed <br /> survey of all wells in the vicinity.Please contact the DWR for procedure to <br /> request well information.Please include prints of historic aerial photos used as <br /> part of your study and use data tables and maps to report the data collected as <br /> art of your survey.Report your results in the SWI report requested below. <br /> 2/5/1 &2 ...During SWI activities,we request that you gather detailed lithologic The workplan addendum inclues cone penetrometry and provides for <br /> t information using borings,continuous core sampling,dual tube expedited site continuous coring during soil borings,as needed. <br /> assessment methods or cone penetrometry together with other methods to <br /> understand the hydrogeology at your site. <br /> 2/5/3 Discrete soil samples collected from each significantly different lithological The workplan specifies that soil samples from distinct lithological units <br /> unit shall be analyzed by a qualified laboratory for permeability,porosity, encountered in the proposed deep monitoring well near the source area(MW- <br /> bulk density,moisture,and organic carbon content. I1 D)be analyzed for permeability(ASTM method 5084),dry bulk density <br /> (ASA 930.2,moisture content(ASTM D2216)and total organic carbon <br /> ASTM D2974).Porosity can also be determined,if needed. <br /> 2/5/4 We also request that you evaluate local groundwater flow conditions and The addendum specifies that the report prepared for the investigation should <br /> establish asite-specific localized flownet that is dependent on hydrology and include this analysis. <br /> geologic conditions and is reflected on h dro eolo is cross sections... <br /> I SFOt98WPTABLE2.D0C <br />