Laserfiche WebLink
Activity II - Groundwater Investigation Downgradient of Former Disco Tanks <br /> This activity is designed to characterize potential offsite migration that may have occurred <br /> as a result of shifting groundwater flow directions.Coincident with rising static water <br /> elevations in the uppermost aquifer is a shift of groundwater flow from primarily north in <br /> 1991 to south in 1995,and currently southeast using the most recent water level <br /> measurements. Based on discussions with PHS staff, there is a need to characterize the <br /> extent of petroleum hydrocarbons in groundwater in the new downgradient direction. <br /> However, due to the location of the Caltrans' Highway 4 "Cross-Town"Freeway,there will <br /> be limitations to drilling locations south of the Disco Tanks. <br /> Activity II will be conducted according to the same four subtasks described in Activity I: <br /> prefield, field activities,laboratory analysis, and reporting. <br /> Subtask 1 Prefield <br /> Prefield activities for this task are similar to Activity I,requiring: <br /> • Updating the well survey in area to identify potential risk receptors,if any. <br /> • underground utility clearance, <br /> • a drilling permit from PHS,and <br /> • an encroachment permit from Caltrans. <br /> The existing well survey will be updated to identify potential risk receptors. Based on <br /> available information, the well survey will include boring logs, screened intervals, current <br /> status,and pumping rates (past,present,and projected future rates and seasonal pumping <br /> patterns). If downgradient water-supply wells are identified,the information may be used <br /> for locating downgradient sampling activities. <br /> The encroachment permit is required because the proposed drilling areas (Figure 1) are <br /> offsite and are in a Caltrans right-of-way. <br /> Caltrans will have to approve a workplan prior to starting work in their right of way. The <br /> Q wo sou re a description of the work,a health and safety plan, a traffic safety plan using Caltrans specifica ' and a maps the locations of the proposed <br /> borings. Approval for this work may 6 nths.This workplan should also <br /> y� describe a n sample any permanent wells ' �edd in the Caltrans right-of-way for the <br /> As�w urpos four arters of monitoring. Provisions must be made to gain access to any <br /> h Qperma s in the future. <br /> task 2 Field Activities <br /> The field activities will start with drilling two borings offsite to determine the lateral extent <br /> of downgradient migration of petroleum hydrocarbons.These borings will be drilled and <br /> continuously logged to a depth of 10 feet below the top of the current static water elevation. <br /> Grab groundwater samples will be collected form both of these borings at the first <br /> occurrence of groundwater.Based on the results from these analyses, a possible third <br /> boring will be drilled adjacent to one of these shallow borings into a lower portion of the <br /> 5 <br />