Laserfiche WebLink
Margaret Laggorio <br /> Page 3 <br /> November 1, 1995 <br /> Project 131420.01.04 <br /> Upon completion of the field work, a summary report documenting the field operations and <br /> well installation procedures will be provided. The report will also document the as-built <br /> condition of the well(s) and plans for future monitoring. <br /> Sincerely, <br /> CH2M HILL <br /> Thom Lit .G. 5410 <br /> Hydrogeologist <br /> I <br /> c:\work\word\delmonte\plant33\svedril.doc <br /> Figures <br /> Figure 1. Boring Locations <br /> Figure 2. Typical SVE Well Construction <br /> f <br /> Enclosures: $89 check <br /> Permit Application for Well Construction <br /> c: Soon Kim, Grant Stewart,File <br /> r <br /> r <br /> r c:\work\ward\delmonte\plant33\svedril.doc <br />