Laserfiche WebLink
u � <br /> 2.0 PROJECT ORGANIZATION AND TASKS TO BE PERFORMED UNDER THIS PLAN <br /> 2.1 PROJECT ORGANIZATION <br /> Del Monte <br /> CH2M HILL Project Administrator: Bern Baumgartner/BAR <br /> CH2M HILL Field Investigation Task Leader: Grant Stewart/BAR <br /> CH2M HILL Site Safety Plan Approver: Bob Nash/SCO <br /> Treatment System Contractor: Environmental Instruments - Chuck Battram <br /> Drilling Contractor: Gregg Drilling, Pecheco - Chris Christensen <br /> Laboratory: Chromalab, San Ramon - Gary Cook <br /> 2.2 DESCRIPTION OF TASKS <br /> Installation of Air Sparging/Soil Vapor Extraction (AS/SVE) wells, AS/SVE System and Maintenance, <br /> and Groundwater Monitoring. <br /> 2.3 DESCRIPTION OF SUBCONTRACTORS <br /> Construction Contractor: Constructing air sparging/soil vapor extraction system. <br /> Drilling Contractor: Install wells necessary to install treatment and monitoring system. <br /> Laboratory: Perform laboratory analysis. <br /> 4 <br /> SF01001385F.WP5 <br />