My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FILBERT
>
110
>
3500 - Local Oversight Program
>
PR0545039
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 10:15:44 AM
Creation date
12/10/2019 10:00:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545039
PE
3528
FACILITY_ID
FA0010186
FACILITY_NAME
DEL MONTE FOODS PLNT #33 - DISCO WH
STREET_NUMBER
110
Direction
N
STREET_NAME
FILBERT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15702009
CURRENT_STATUS
02
SITE_LOCATION
110 N FILBERT ST
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I r 1 U <br /> 4.0 PERSONNEL <br /> I <br /> 4.1 C112M HILL EMPLOYEES aacraaaNce cairn aiu sop asm nnv as o) <br /> Employees listed below are enrolled in the CH2M HILL chemical protection program (CPP) and meet the j <br /> medical surveillance, 40-hour initial training, 3-day on-the-job experience, and 8-hour annual refresher <br /> training requirements of OSHA 29CFRI910.120 and Cal/OSHA 5192. Employees designated "SSC" have <br /> received 8 hours of supervisor and 8 hours of instrument training and can serve as site safety coordinator <br /> (SSC) for the level of protection indicated. There must be one SSC present during any task performed in <br /> exclusion or decontamination zones with the potential for exposure to safety and health hazards. Employees <br /> designated "FA-CPR" are currently certified by the American Red Cross, or equivalent, in first aid and i <br /> CPR. There must be one FA-CPR designated employee present during any task performed in exclusion or <br /> decontamination zones with the potential for exposure to safety and health hazards. The "buddy system" <br /> requirements of OSHA 29CFR1910.120 and Cal/OSHA 5192 are to be met at all times. <br /> Employee Name OMce Responsibility SSC/FA-CPR <br /> Grant Stewart BAR Project Manager Level C, FA - CPR <br /> Keith Sheets BAR Field Team Leader Level C, SSC/FA - CPR <br /> Marty Medina BAR Field Team Member FA-CPR <br /> Latonya Garrett BAR Field Team Member Level C, SSC/FA - CPR <br /> 4.2 HEALTH AND SAFETY AND FIELD TEAM CHAIN OF COMMAND AND j <br /> PROCEDURES ! <br /> 4.2.1 CLIENT <br /> 1 <br /> Del Monte, Soon Kim k <br /> 205 N. Wiget Lane <br /> Walnut Creek, CA 94598 <br /> 510/944-7335 <br /> 4.2.2 CH2M HILL PERSONNEL RESPONSIBILnUS <br /> Project Manager <br /> • Manages project and is responsible for overall planning, execution, and supervision of <br /> project field work. <br /> • Inspect treatment system construction <br /> 1 <br /> i <br /> { <br /> 11 <br /> SF01001385F.WP5 <br /> I <br /> J <br />
The URL can be used to link to this page
Your browser does not support the video tag.